42 percent of the Commission’s <strong>2010</strong> direct expense budget was for the Operations<br />

Division. Of the Operations Division’s direct expense budget, about $14 million was for<br />

sewer and storm drain related operations.<br />

Approximately $7.6 million or 13 percent of the Commission’s <strong>2010</strong> direct expense<br />

budget was for the Engineering Division. About $4.4 million of the Engineering<br />

Division’s direct expense budget was for sewer and drain related work. Put another way,<br />

about $18.4 million was budgeted for Operations and Engineering Division’s direct<br />

expenses relating to sewer and drain work. Thus sewer and drain related work represents<br />

about 32 percent of the Commission’s total direct expense budget.<br />

The Current Expense Budget for 2011 had not been finalized as of the writing of this<br />

report. However, it is anticipated that the 2011 CEB will provide a similar level of<br />

funding for direct expenses relating to sewer and drain work.<br />

<strong>Stormwater</strong> related programs and activities funded under the Current Expense Budget<br />

include:<br />

• Illegal connection investigations and corrections<br />

• Illegal connection prevention<br />

• Illegal dumping and spill response<br />

• Infiltration and inflow identification and reduction<br />

• Issuing Drainage Discharge Permits<br />

• Storm drain inspections and sampling<br />

• Sewer and storm drain maintenance and general repair<br />

• Catch basin and particle separator cleaning and maintenance<br />

• Designing and installing new particle separators<br />

• Site plan review<br />

• New service inspections and dye tests<br />

• Issuing drain layers licenses<br />

• Designing and constructing capital improvements<br />

• Reviewing <strong>Environmental</strong> Notification Forms and <strong>Environmental</strong> Impact <strong>Report</strong>s<br />

• Public education<br />

• Rain data collection<br />

6.2 CAPITAL EXPENDITURES<br />

The <strong>2010</strong>-2012 CIP included $44.1 million for sewer and drain related projects, of which<br />

$14.1 million was earmarked for <strong>2010</strong>. The Commission’s 2011-2013 CIP plan identifies<br />

$66.6 million for sewer and drain related projects, of which $20.5 million is earmarked<br />

for 2011. The complete 2011-2013 CIP plan is available on the Commission’s website at<br />

www.bwsc.org.<br />

6 - 2

Hooray! Your file is uploaded and ready to be published.