These costs do not include the cost of CSO separation projects that are funded by the<br />

MWRA under the MWRA’s CSO Control Plan. However, they do include the<br />

Commission’s costs for water and sewer work relating to the MWRA’s CSO Control<br />

Plan that is not eligible for MWRA funding.<br />

Programmatic activities covered under the 2011-2013 CIP include the following:<br />

• Preparation of a Wastewater/Drainage Facilities Plan.<br />

• Implementation of a system-wide sewer metering program.<br />

• Installation and upgrade of the Commission’s rain gauges.<br />

• Construction of a new storm drainage system along Morrissey Boulevard to<br />

facilitate sewer separation.<br />

• Relocation of the regulator on the Dorchester Brook Sewer to remove storm flow<br />

from 185 acres of land that currently flows to the New Boston Main Interceptor.<br />

• Identification and elimination of illegal connections to storm drains.<br />

• Renewal and replacement (R/R) of sewers and drains.<br />

• Projects to increase the capacity of existing sewers to maintain hydraulic capacity<br />

and structural integrity of the system, and prevent or reduce combined sewer<br />

overflows.<br />

• Separation of combined sewers in various areas of the city, with major projects<br />

occurring in the South End, Roxbury, Fenway/Kenmore, South Boston and<br />

Dudley Square.<br />

• Disconnection of downspout in Jamaica Plain, Dorchester, Allston-Brighton,<br />

West Roxbury, Roslindale, South Boston and Hyde Park.<br />

• Projects relating to the MWRA’s CSO control plan that are necessary, but are not<br />

eligible for funding by the MWRA. These include renewal and replacement of<br />

existing sewers and drains in the areas being separated, rehabilitation or relay of<br />

water mains in the areas, and associated paving costs.<br />

6 - 3