02.12.2014 Views

Outline of Quino Recovery Plan - The Xerces Society

Outline of Quino Recovery Plan - The Xerces Society

Outline of Quino Recovery Plan - The Xerces Society

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IMPLEMENTATION SCHEDULE FOR QUINO CHECKERSPOT RECOVERY PLAN<br />

Task<br />

Total<br />

Cost ($1,000's)<br />

Priority Task Task Description<br />

Duration<br />

Responsible<br />

Estimated<br />

Cost<br />

# # (Years) Agencies ($1,000's) FY<br />

FY<br />

FY<br />

FY<br />

FY<br />

01<br />

02<br />

03<br />

04<br />

05<br />

94<br />

1 1.1.2.2. Lake Skinner and Johnson Ranch<br />

area: protect as much remaining<br />

undeveloped suitable and<br />

restorable linked habitat patches as<br />

possible.<br />

1 1.1.3. South Riverside <strong>Recovery</strong> Unit:<br />

protect as much remaining<br />

undeveloped suitable and restorable<br />

linked habitat patches within and<br />

between the two habitat complexes as<br />

possible<br />

3 USFWS*, RC, UCR TBD TBD TBD TBD<br />

3 USFWS*, BLM, SDC TBD TBD TBD TBD<br />

1 1.1.4. South Riverside/North San Diego<br />

<strong>Recovery</strong> Unit: protect as much as<br />

remaining undeveloped suitable and<br />

restorable habitat patches within and<br />

between the two habitat complexes as<br />

possible.<br />

3 USFWS*, BLM, RC,<br />

SDC<br />

TBD TBD TBD TBD<br />

1 1.1.5.1. Protect and manage landscape<br />

connectivity through Proctor Valley<br />

between the habitats in San Diego<br />

National Wildlife Refuge and the Otay<br />

Lakes area.<br />

2 USFWS*, SDC TBD TBD TBD

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!