<strong>Marin</strong>-5 Operator’s <strong>Manual</strong><br />
Installing the <strong>Marin</strong>-5<br />
Installing the <strong>Marin</strong>-5<br />
To install the <strong>Marin</strong>-5, you must complete the following tasks:<br />
WARNING<br />
Ensure that the AC power is off (0 showing at the bottom edge of<br />
the power switch) on the back of the <strong>Marin</strong>-5 before proceeding<br />
with installation.<br />
Establishing External Connections<br />
The first step in the installation process involves connecting the<br />
<strong>Marin</strong>-5 to the power source and to the ICP-AES or ICP-MS instrument.<br />
The following sections explain how to establish these connections.<br />
<strong>Marin</strong>-5 Voltage Selection<br />
The <strong>Marin</strong>-5 can be set to operate at 110 VAC or 220 VAC. To check the<br />
voltage setting, locate the switches on the underside of the <strong>Marin</strong>-5<br />
cabinet. Use a small, flat-blade screwdriver to set both switches to<br />
either 115V or 230V. See Figure 3- 1 below.<br />
Figure 3- 1 Voltage Selection Switches<br />
3–2