Marin-5 Operator's Manual - CETAC Technologies
Marin-5 Operator's Manual - CETAC Technologies
Marin-5 Operator's Manual - CETAC Technologies
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Marin</strong>-5 Operator’s <strong>Manual</strong><br />
Verifying Installation<br />
Verifying Installation<br />
Once installation of the <strong>Marin</strong>-5 is complete, it is important to verify<br />
that you have installed the system correctly. Attempting to use the<br />
<strong>Marin</strong>-5 before ensuring that it is installed correctly may result in<br />
damage to the system.<br />
Verifying installation of the <strong>Marin</strong>-5 consists of three parts:<br />
• Initial operation procedure<br />
• ICP-AES or ICP-MS operation under normal conditions<br />
• System Optimization<br />
This chapter explains initial operation of the <strong>Marin</strong>-5, ICP-AES and<br />
ICP-MS operation, and the optimization of the <strong>Marin</strong>-5.<br />
Initial Operating Procedure<br />
1 Plug the supplied power cord into the <strong>Marin</strong>-5 and then into the<br />
AC supply outlet.<br />
2 Turn on the power switch and allow the temperature<br />
controllers to preheat and cool. After approximately 5-10<br />
minutes, all stages should be operating at a steady state as<br />
indicated by temperature readings of 120°C on the heater for<br />
the spray chamber/glassware and 3°C on the cooler for the<br />
condenser.<br />
Heater<br />
°C<br />
Standard Conditions – ICP-AES<br />
Cooler<br />
°C<br />
Nebulizer Gas Flow<br />
L/min<br />
120° 3° 0.5 – 0.8