03.01.2015 Views

Marin-5 Operator's Manual - CETAC Technologies

Marin-5 Operator's Manual - CETAC Technologies

Marin-5 Operator's Manual - CETAC Technologies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Marin</strong>-5 Operator’s <strong>Manual</strong><br />

Verifying Installation<br />

Verifying Installation<br />

Once installation of the <strong>Marin</strong>-5 is complete, it is important to verify<br />

that you have installed the system correctly. Attempting to use the<br />

<strong>Marin</strong>-5 before ensuring that it is installed correctly may result in<br />

damage to the system.<br />

Verifying installation of the <strong>Marin</strong>-5 consists of three parts:<br />

• Initial operation procedure<br />

• ICP-AES or ICP-MS operation under normal conditions<br />

• System Optimization<br />

This chapter explains initial operation of the <strong>Marin</strong>-5, ICP-AES and<br />

ICP-MS operation, and the optimization of the <strong>Marin</strong>-5.<br />

Initial Operating Procedure<br />

1 Plug the supplied power cord into the <strong>Marin</strong>-5 and then into the<br />

AC supply outlet.<br />

2 Turn on the power switch and allow the temperature<br />

controllers to preheat and cool. After approximately 5-10<br />

minutes, all stages should be operating at a steady state as<br />

indicated by temperature readings of 120°C on the heater for<br />

the spray chamber/glassware and 3°C on the cooler for the<br />

condenser.<br />

Heater<br />

°C<br />

Standard Conditions – ICP-AES<br />

Cooler<br />

°C<br />

Nebulizer Gas Flow<br />

L/min<br />

120° 3° 0.5 – 0.8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!