03.01.2015 Views

Marin-5 Operator's Manual - CETAC Technologies

Marin-5 Operator's Manual - CETAC Technologies

Marin-5 Operator's Manual - CETAC Technologies

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Marin</strong>-5 Operator’s <strong>Manual</strong><br />

Installing the <strong>Marin</strong>-5<br />

8 Carefully place the two Teflon PFA drain lines through the<br />

rear panel hole and attach the lines to the peristaltic drain<br />

pump on the back of the <strong>Marin</strong>-5. See Figure 3- 7. Note that<br />

the drain lines may be connected to either open pump channel.<br />

Figure 3- 7. Connection of PFA Drain Lines to Drain Pump.<br />

9 Carefully replace the cover onto the <strong>Marin</strong>-5 cabinet.<br />

Connecting the <strong>Marin</strong>-5 to the ICP-AES or ICP-MS<br />

Depending on the ICP-AES or ICP-MS manufacturer and model, a torch<br />

adapter is supplied for interfacing. Adapters are available for all ICP-<br />

AES or ICP-MS instruments.<br />

10 A length of 5/16” O.D. x 3/16” I.D. Tygon® PVC tubing is<br />

provided with the appropriate ICP-AES or ICP-MS torch<br />

3–8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!