condair FF2
condair FF2
condair FF2
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
19<br />
4.2 Accessories and options<br />
Accessories<br />
Accessory<br />
High-pressure hose for<br />
high-pressure piping<br />
Anti-chafe spiral hose<br />
RJ45 bus cable<br />
Description<br />
High-pressure hoses for establishing the high-pressure<br />
piping between the high-pressure connectors of the<br />
pump.<br />
Hoses of 2 m, 5 m or 10 m length available (from stock)<br />
The anti-chafe spiral hose protects the high-pressure<br />
hoses in locations where they are subject to get in touch<br />
with each other or with other system components.<br />
Length: 3 m<br />
The bus cable connects the control units of a masterslave<br />
configuration.<br />
Length: 10 m or 20 m<br />
Options<br />
Option<br />
Floor stand for pump station<br />
Droplet separator<br />
Remote operating and fault<br />
indication<br />
Conductivity monitoring<br />
Flushing valve Y6<br />
e-LINKS <strong>FF2</strong><br />
Floor stand for pump station<br />
Floor stand made of corrosion resistant steel, for mounting<br />
the pump station at a convenient height for easy operation.<br />
Droplet separator in frame construction made of corrosion<br />
resistant steel equipped with collector meshes with<br />
a special biocide coating.<br />
With unfavourable flow conditions and/or high air speed<br />
in the duct additionally a deflection sheet is provided for<br />
the optimization of the incident air flow of the first droplet<br />
separator.<br />
Print with relay contacts for the remote indication of the<br />
following operating conditions: Unit on, Humidification,<br />
Error and Maintenance.<br />
The conductivity monitoring, consisting of the conductivity<br />
sensor and the conductivity print, monitors the<br />
electrical conductivity of the water and outputs an error<br />
message if the lower limit value is exceeded.<br />
Flushing valve for the automatic flushing of the high<br />
pressure piping during operation. The flushing valve is<br />
installed directly to the step valve block.<br />
Gateway to connect the Condair <strong>FF2</strong> to a building management<br />
system. Two versions are available:<br />
BACnet/IP or LonWorks