39<br />

7.2 Setting the unit into operation<br />

Important! The procedure described hereafter assumes that the system has been installed correctly and<br />

initial commissioning has been carried out duly by a service technician of the manufacturer/distributor.<br />

Proceed as follows to set the Condair <strong>FF2</strong> into operation:<br />

1. Check all system components and installations for possible damage.<br />

WARNING!<br />

A damaged system or a system with damaged installations must not be set into operation.<br />

2. Open the stop valve of the water supply line.<br />

3. Activate the service switch of the power supply line to the pump station, and if present to the<br />

Slave control units.<br />

4. Actuate the power switch of the pump station, and if present of the Slave control units.<br />

The control carries out a system test and the supply line is flushed. During the test all three LED’s<br />

light up temporarily and the display shows the opposite message.<br />

<strong>FF2</strong><br />

STARTUP:<br />

INIT MODUL<br />

If a failure occurs during the system test, a corresponding error message<br />

is shown in the display.<br />

<strong>FF2</strong><br />

Standby<br />

05.01.2009 12.00.00<br />

Menu<br />

<strong>FF2</strong><br />

Demand :100%<br />

Set<br />

05.01.2009 12.00.00<br />

Menu<br />

Set<br />

After the system test the unit is in normal operation mode. The display<br />

shows the standard operating display (first page of the indication<br />

level).<br />

Note: The contents of the standard operating display depends on the actual<br />

operating status and on the configuration of the Condair <strong>FF2</strong> and can differ<br />

from the opposite display.<br />

As soon as a humidity demand is present, the supply valve opens and the<br />

pump starts. As soon as the necessary working pressure is reached, one<br />

two or all three step valves open depending on the current demand and<br />

the Condair <strong>FF2</strong> humidifies.<br />

Note: If a humidity demand is present but since the last flushing of the<br />

supply line more than 1 hour has passed, the supply line is flushed first<br />

and then the pump is started.<br />

Note: for detailed information regarding the operation of the control unit and the settings please<br />