condair FF2
condair FF2
condair FF2
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
39<br />
7.2 Setting the unit into operation<br />
Important! The procedure described hereafter assumes that the system has been installed correctly and<br />
initial commissioning has been carried out duly by a service technician of the manufacturer/distributor.<br />
Proceed as follows to set the Condair <strong>FF2</strong> into operation:<br />
1. Check all system components and installations for possible damage.<br />
WARNING!<br />
A damaged system or a system with damaged installations must not be set into operation.<br />
2. Open the stop valve of the water supply line.<br />
3. Activate the service switch of the power supply line to the pump station, and if present to the<br />
Slave control units.<br />
4. Actuate the power switch of the pump station, and if present of the Slave control units.<br />
The control carries out a system test and the supply line is flushed. During the test all three LED’s<br />
light up temporarily and the display shows the opposite message.<br />
<strong>FF2</strong><br />
STARTUP:<br />
INIT MODUL<br />
If a failure occurs during the system test, a corresponding error message<br />
is shown in the display.<br />
<strong>FF2</strong><br />
Standby<br />
05.01.2009 12.00.00<br />
Menu<br />
<strong>FF2</strong><br />
Demand :100%<br />
Set<br />
05.01.2009 12.00.00<br />
Menu<br />
Set<br />
After the system test the unit is in normal operation mode. The display<br />
shows the standard operating display (first page of the indication<br />
level).<br />
Note: The contents of the standard operating display depends on the actual<br />
operating status and on the configuration of the Condair <strong>FF2</strong> and can differ<br />
from the opposite display.<br />
As soon as a humidity demand is present, the supply valve opens and the<br />
pump starts. As soon as the necessary working pressure is reached, one<br />
two or all three step valves open depending on the current demand and<br />
the Condair <strong>FF2</strong> humidifies.<br />
Note: If a humidity demand is present but since the last flushing of the<br />
supply line more than 1 hour has passed, the supply line is flushed first<br />
and then the pump is started.<br />
Note: for detailed information regarding the operation of the control unit and the settings please<br />
observe the information given in the separate operating instructions to the control unit <strong>FF2</strong>.