5.3.4 Water installation<br />
Master Slave 1...3<br />
Y6 **<br />
Y3 Y4 Y5<br />
Y3 Y4 Y5<br />
M20x1.5<br />
ø19 mm hose connector<br />
or G 1/2" inside thread<br />
Notes on water installation<br />
– Use hoses to connect the supply flushing line and the tub drain to an open drain funnel (make<br />
sure to install the hoses correctly).<br />
– The working pressure flushing valve Y6 (**) is mounted directly to the step valve block of the<br />
Master unit (stand-alone system) or the last Slave unit (Compound systems). The drain hose<br />
of the flushing valve is to be connected to an open drain funnel (make sure to install the hose<br />
correctly).<br />
– Use only the optional high-pressure hoses to establish the high-pressure piping between the<br />
high-pressure connection of the pump station and the step valve block (or between step valve<br />
blocks of the Slave units, respectively). Other hoses may get damaged in operation and cause<br />
system breakdown.