27.01.2015 Views

DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...

DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...

DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1 The Architectural Boazd of Review along with the Director<br />

Commissioner members ofthe Ieritage Advisory Boazd and<br />

other officials ofthe City as needed may participate in nego<br />

tiations with the owner or owners and any other interested<br />

party in an effort to find ameans of preserving the historic in<br />

tegrity of the property The<br />

the aforementioned shall investigate<br />

feasibility of all means of preserving the historic integrity<br />

ofthodesignated praperry If the aforementioned donotaee<br />

on a means of preserving the historic integrity ofthe property<br />

at the initial meeting then they may continue to undertake<br />

meaningful and continuing discussion ofthe purpose offmd<br />

ing amethod of saving the historic integrity of the property<br />

2 Ifthe applicant fails to meet with the aforementioned in good<br />

faith in the time specified then the Architectural Board of<br />

Review s denial of the application will stand<br />

3 Ifaet holding such good faith meetings in the waiting period<br />

specified by the Architectural Board of Review the Director<br />

determines in writing that failure to approve a Certificate of<br />

Appropriateness wfll create a substantial hazdship to the appli<br />

cant and that such certificate may be approved without sub<br />

stantial detriment to the public welfare andwithout substantial<br />

derogation from the purposes ofthis Chapter therein in such<br />

event the Architectural Board ofReview can approve aCer<br />

tificate ofAppropriateness for such proposed demolition<br />

k<br />

Alternative Summary Procedures Not Requiring Board or Com<br />

mission Action The or<br />

Duector<br />

his her designee may administra<br />

fively approve an application for a Certificate ofAppropriateness for<br />

the following activities<br />

1 Repair or replacement of gutters and downspouts provided<br />

there isno change in material or location<br />

2 Exterior wall insulation provided the exterior holes aze re<br />

paired with a matching material For vinyl or aluminum sid<br />

ing the necessary siding shall be removed prior to the work<br />

and then reinstalled Insulation work that requires venting of<br />

any type that appears onthe exterior of astructure requires a<br />

Certificate ofAppropriateness<br />

3 Re roofing only with like material andifthe original style and<br />

shape of the roof is not altered<br />

4 Storm windows and storm doors provided that the item s<br />

stalled<br />

in<br />

A<br />

B<br />

do not siaanificanfly alter the visual effect ofthe open<br />

mg<br />

is are<br />

compatible with the character ofthe building<br />

to<br />

al

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!