DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...
DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...
DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2 Ifthe applicant fails to meet with the aforementioned in good<br />
faith in the time specified then the Architectural Board of<br />
Review sdenial ofthe applicationwill stand<br />
3 If after holding such good faith meetings in the waiting pe<br />
riod the Director determines in writing that failure to approve<br />
an application fora Geitificate of<br />
Appropriateness vriilcreate a<br />
substantial hazdship to the applicant and that such certificate<br />
may be approved without substantial detriment to the public<br />
welfaze and without substantial derogation from the purposes<br />
of this Chapter then the Architectural Boazd ofReview can<br />
approve aCertificate of Appropriateness for such proposed al<br />
teration<br />
j<br />
Alternative Summary Procedures Not Requiring Board or Com<br />
mission Action The Duector or his her designee may administra<br />
tively approve an application for a Certificate of Appropriateness for<br />
the following activities<br />
1 Repair or replacement of gutters and downspouts provided<br />
thereis no change inmaterial or location<br />
2 Exterior wall insulation provided the exterior holes are re<br />
paired with a matching material For vinyl or aluminum sid<br />
ing the necessary siding shall be removed prior<br />
to the work<br />
andthen reinstalled Insulation work that requires venting of<br />
any type that appears on the exterior of a structure requires a<br />
Certificate of Appropriateness<br />
3 Re roofing only with like material andifthe original style and<br />
shape ofthe roofis not altered<br />
4 Storm windows and storm doors provided that the items in<br />
stalled<br />
A<br />
B<br />
C<br />
does<br />
not significantly alter the visual effect ofthe<br />
opening<br />
is are compatible with the character ofthe building<br />
does donot require the removal of original windows<br />
and ordoors<br />
5 Repair ofthe surface ofdriveways pazking or loading<br />
walkways with like mateaal<br />
areas or<br />
k<br />
Summary Procedures Report The Director shall provide to the Ar<br />
chitecuiralBoard ofReview a summary ofthe Certificates of Appropri<br />
ateness for each administrative approval issued<br />
1 As long as the following activities do notresult in alteration tothelRD<br />
orHP they are approved<br />
zs 1