27.01.2015 Views

DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...

DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...

DOCKET OF A MEETING OF THE LAKEWOOD CITY COUNCIL TO ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2 Ifthe applicant fails to meet with the aforementioned in good<br />

faith in the time specified then the Architectural Board of<br />

Review sdenial ofthe applicationwill stand<br />

3 If after holding such good faith meetings in the waiting pe<br />

riod the Director determines in writing that failure to approve<br />

an application fora Geitificate of<br />

Appropriateness vriilcreate a<br />

substantial hazdship to the applicant and that such certificate<br />

may be approved without substantial detriment to the public<br />

welfaze and without substantial derogation from the purposes<br />

of this Chapter then the Architectural Boazd ofReview can<br />

approve aCertificate of Appropriateness for such proposed al<br />

teration<br />

j<br />

Alternative Summary Procedures Not Requiring Board or Com<br />

mission Action The Duector or his her designee may administra<br />

tively approve an application for a Certificate of Appropriateness for<br />

the following activities<br />

1 Repair or replacement of gutters and downspouts provided<br />

thereis no change inmaterial or location<br />

2 Exterior wall insulation provided the exterior holes are re<br />

paired with a matching material For vinyl or aluminum sid<br />

ing the necessary siding shall be removed prior<br />

to the work<br />

andthen reinstalled Insulation work that requires venting of<br />

any type that appears on the exterior of a structure requires a<br />

Certificate of Appropriateness<br />

3 Re roofing only with like material andifthe original style and<br />

shape ofthe roofis not altered<br />

4 Storm windows and storm doors provided that the items in<br />

stalled<br />

A<br />

B<br />

C<br />

does<br />

not significantly alter the visual effect ofthe<br />

opening<br />

is are compatible with the character ofthe building<br />

does donot require the removal of original windows<br />

and ordoors<br />

5 Repair ofthe surface ofdriveways pazking or loading<br />

walkways with like mateaal<br />

areas or<br />

k<br />

Summary Procedures Report The Director shall provide to the Ar<br />

chitecuiralBoard ofReview a summary ofthe Certificates of Appropri<br />

ateness for each administrative approval issued<br />

1 As long as the following activities do notresult in alteration tothelRD<br />

orHP they are approved<br />

zs 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!