Testing in a Joint Environment Roadmap - U.S. Army Operational ...
Testing in a Joint Environment Roadmap - U.S. Army Operational ...
Testing in a Joint Environment Roadmap - U.S. Army Operational ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
For Official Use Only<br />
<strong>Test<strong>in</strong>g</strong> <strong>in</strong> a Jo<strong>in</strong>t <strong>Environment</strong> <strong>Roadmap</strong><br />
2.6.2.2 PERSISTENT CAPABILITY<br />
The persistent capability phase will add a stand<strong>in</strong>g capability for schedul<strong>in</strong>g support, so that<br />
ongo<strong>in</strong>g events can be browsed and selected for potential opportunities to support test vignettes<br />
for programs based upon def<strong>in</strong>ed jo<strong>in</strong>t mission environments. Determ<strong>in</strong><strong>in</strong>g the impacts that new<br />
systems will have on the battlefield, and test<strong>in</strong>g of <strong>in</strong>teractions between a virtual prototype and<br />
live systems (with some additional augmentation us<strong>in</strong>g constructive simulations) will be the<br />
focus of this milestone. Dur<strong>in</strong>g this phase, all jo<strong>in</strong>t mission environments should be def<strong>in</strong>ed so<br />
that the jo<strong>in</strong>t mission <strong>in</strong>frastructure can support all acquisition programs. In addition, newer<br />
distributed software technologies, currently under development both with<strong>in</strong> the Department’s<br />
science and technology (S&T) community and private <strong>in</strong>dustry, will be mature enough to be<br />
<strong>in</strong>corporated and leveraged <strong>in</strong> the common middleware <strong>in</strong> annual upgrades. Likewise, improved<br />
collaboration software solutions will be <strong>in</strong>cluded <strong>in</strong> the standard software suite of support tools.<br />
Date: FY2012.<br />
2.6.2.3 INTERACTIVE CAPABILITY<br />
The <strong>in</strong>teractive capability phase will provide the stand<strong>in</strong>g capability for test eng<strong>in</strong>eers to<br />
seamlessly select between scheduled events or launch their own live, virtual, or hybrid event<br />
(us<strong>in</strong>g available virtual prototypes and constructive simulations). Aid<strong>in</strong>g design trade-off<br />
decisions and test<strong>in</strong>g of <strong>in</strong>teractions between multiple virtual prototypes (with some additional<br />
augmentation us<strong>in</strong>g constructive simulations) will be the focus of this phase. The operational<br />
<strong>in</strong>teractive capability will enable full T&E of capabilities-based systems aga<strong>in</strong>st the jo<strong>in</strong>t<br />
performance attributes def<strong>in</strong>ed <strong>in</strong> the JCIDS capabilities documents (ICD, CDD and CPD), and<br />
the ability to do so for evolutionary and spiral developments. Date: FY2015.<br />
33<br />
For Official Use Only