2. FIELDWORK RESULTS<br />
TOPOGRAPHIC SURVEY<br />
Oscar Aldred, FSÍ<br />
A contour survey was carried out over 3 days, between 19th and 21st June, <strong>2002</strong> in the<br />
area immediately south and west of the main excavation area. The survey area covered c.<br />
17,520 square metres, with a perimeter of c. 0.65 km.<br />
Objectives<br />
The initial ground truthing of the survey area showed there to be several earthwork<br />
features, ranging in extent from 2-3 metres to over 100 metres in length. There was also<br />
28 metres range in the height; c. 59 metres to c. 77 metres. As a result it was decided to<br />
set the resolution of the survey at 5 metres. The objectives of the <strong>2002</strong> season were to:<br />
1. To obtain a coarse resolution contour survey of the area at approximately 5m<br />
resolution;<br />
2. To identify areas for targeted survey in the following season.<br />
Methodology<br />
The survey was carried out using 2 Trimble 4600LS GPS units to track GPS satellites on<br />
the L1 frequency. A TDC1 Survey Controller was used. A Base Station Receiver was set<br />
up over a free station point (i.e. not known) and was initialised with the Rover. The<br />
poisiton of the Base Station Receiver was calibrated. The accuracy of the survey x, y, z<br />
was to +-1 m.<br />
7