19.02.2015 Views

FS1575_2575_5075 Installation Manual E1 6-15-2012 - Furuno USA

FS1575_2575_5075 Installation Manual E1 6-15-2012 - Furuno USA

FS1575_2575_5075 Installation Manual E1 6-15-2012 - Furuno USA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1. HOW TO INSTALL THE SYSTEM<br />

1.2.3 <strong>Installation</strong> procedure<br />

Outdoor installation<br />

Fasten the Antenna Coupler to a bulkhead of the bridge, mast, handrail, etc., with the M6 bolts<br />

(local supply).<br />

For installation on the mast, see section 1.5 to select a location. Weld suitable mounting fixtures<br />

(local supply) to the mast and bolt the coupler there.<br />

Fix with four<br />

M6 bolts<br />

(local supply).<br />

Mounting fixture<br />

(Local supply)<br />

Indoor installation<br />

Pictured: AT-<strong>5075</strong><br />

DO NOT install<br />

coupler horizontally.<br />

Fasten the Antenna Coupler to a bulkhead on the bridge or the overhead. Select a location where<br />

the distance between the lead-in insulator and the coupler is as short as possible.<br />

Lead-in<br />

insulator<br />

Antenna switch<br />

<strong>Installation</strong> on the overhead<br />

Stand-off<br />

insulator<br />

From antenna selection switch<br />

<strong>Installation</strong> on a bulkhead<br />

5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!