7.3.-5<br />

CHANGE ORDERS – (including architect/engineer fees, construction contracts, equipment<br />

purchases and all other miscellaneous expenditures) which are less than $20,000.<br />

Peru <strong>State</strong> <strong>College</strong><br />

Location on Campus:<br />

No. & Description:<br />

Change Order Amount:<br />

Fund Source:<br />

Contractor:<br />

Location on Campus:<br />

No. & Description:<br />

Change Order Amount:<br />

Fund Source:<br />

Contractor:<br />

AV Larson<br />

#1 Additional sidewalk per Fire Marshall<br />

$2,720<br />

LB 309<br />

Herner Construction Inc.<br />

Al Wheeler Activity Center<br />

HVAC Upgrades Phase I and II<br />

-$289,682 (Funds already approved for expenditure)<br />

Change to clarify funding source for LB 309<br />

Lueder Construction<br />

Wayne <strong>State</strong> <strong>College</strong><br />

Location on Campus:<br />

No. & Description:<br />

Change Order Amount:<br />

Fund Source:<br />

Contractor:<br />

Location on Campus:<br />

No. & Description:<br />

Change Order Amount:<br />

Fund Source:<br />

Contractor:<br />

Location on Campus:<br />

No. & Description:<br />

Change Order Amount:<br />

Fund Source:<br />

Contractor:<br />

Location on Campus:<br />

No. & Description:<br />

Change Order Amount:<br />

Fund Source:<br />

Contractor:<br />

Benthack Re-Roof<br />

#1, 2, 3, & 4 Additional asbestos removal/disposal; adjust to actual conditions<br />

$<strong>14</strong>,960.00<br />

309/CIF<br />

Otte Construction, Wayne, NE<br />

Campus Services Construction<br />

#4 & 5, CCD 2 add’l excavation to site conditions; removal of existing lines<br />

$28,021.76<br />

LB605<br />

RaDec Construction, Hartington NE<br />

Connell Re-Roof<br />

#1 Provide/Install Microllam blocking on existing beams<br />

$654.00<br />

309/CIF<br />

Otte Construction, Wayne, NE<br />

Terrace Hall Tuckpointing<br />

#1 & 2 Changes due to actual conditions<br />

-$1,177<br />

Contingency Maintenance<br />

Williams Restoration, Papillion, NE