7.3.-5<br />
CHANGE ORDERS – (including architect/engineer fees, construction contracts, equipment<br />
purchases and all other miscellaneous expenditures) which are less than $20,000.<br />
Peru <strong>State</strong> <strong>College</strong><br />
Location on Campus:<br />
No. & Description:<br />
Change Order Amount:<br />
Fund Source:<br />
Contractor:<br />
Location on Campus:<br />
No. & Description:<br />
Change Order Amount:<br />
Fund Source:<br />
Contractor:<br />
AV Larson<br />
#1 Additional sidewalk per Fire Marshall<br />
$2,720<br />
LB 309<br />
Herner Construction Inc.<br />
Al Wheeler Activity Center<br />
HVAC Upgrades Phase I and II<br />
-$289,682 (Funds already approved for expenditure)<br />
Change to clarify funding source for LB 309<br />
Lueder Construction<br />
Wayne <strong>State</strong> <strong>College</strong><br />
Location on Campus:<br />
No. & Description:<br />
Change Order Amount:<br />
Fund Source:<br />
Contractor:<br />
Location on Campus:<br />
No. & Description:<br />
Change Order Amount:<br />
Fund Source:<br />
Contractor:<br />
Location on Campus:<br />
No. & Description:<br />
Change Order Amount:<br />
Fund Source:<br />
Contractor:<br />
Location on Campus:<br />
No. & Description:<br />
Change Order Amount:<br />
Fund Source:<br />
Contractor:<br />
Benthack Re-Roof<br />
#1, 2, 3, & 4 Additional asbestos removal/disposal; adjust to actual conditions<br />
$<strong>14</strong>,960.00<br />
309/CIF<br />
Otte Construction, Wayne, NE<br />
Campus Services Construction<br />
#4 & 5, CCD 2 add’l excavation to site conditions; removal of existing lines<br />
$28,021.76<br />
LB605<br />
RaDec Construction, Hartington NE<br />
Connell Re-Roof<br />
#1 Provide/Install Microllam blocking on existing beams<br />
$654.00<br />
309/CIF<br />
Otte Construction, Wayne, NE<br />
Terrace Hall Tuckpointing<br />
#1 & 2 Changes due to actual conditions<br />
-$1,177<br />
Contingency Maintenance<br />
Williams Restoration, Papillion, NE