PHYSICAL PLANT STATUS REPORT<br />
<strong>College</strong>: Wayne <strong>State</strong> <strong>College</strong> Meeting Date: Sept. <strong>13</strong>-<strong>14</strong>, 2007<br />
Project Description Status Fund Source<br />
LB 309 Projects<br />
Benthack Fire Alarms Construction in Progress LB 309<br />
Benthack Roof Complete – pending final report LB 309<br />
Campus Grounds Water Main Complete – pending final report LB 309<br />
Carhart Elevator/stairs Complete – pending final report LB 309<br />
Carhart Hall Restroom Add. Complete – pending final report LB 309<br />
Carhart Sprinkler <strong>System</strong> Complete – pending final report LB 309<br />
Connell Hall Design<br />
Construction in Progress LB 309<br />
Roof/Fascia/Soffit Repair<br />
Education ADA Door Hardwre Construction in Progress LB 309<br />
Education ADA Restrooms Complete – final report sent LB 309<br />
Hahn HVAC Study Will begin Fall 2007 LB 309<br />
Hahn Soffit/Fascia Restoration Construction in Progress LB 309<br />
Humanities ADA Restrooms Complete – final report sent LB 309<br />
Peterson HVAC Upgrade Design to begin Fall 2007 LB 309<br />
Rice Auditorium ADA Elevator In Design LB 309<br />
LB 1100 Projects (99-00)<br />
Rice Auditorium Complete, pending final report LB 1100<br />
LB 605 Projects (2006)<br />
Campus Services Bldg Construction in Progress LB 605<br />
Campus Streets/Commons Construction in Progress LB 605<br />
Rice Basement Design Development 95% LB 605<br />
Stadium (weight<br />
Design Development 95% LB 605<br />
room/lockers/offices)<br />
Visitor Bleachers (FB) Installation in Sept. 2007 LB 605<br />
Revenue Bond Projects<br />
Contingency Maintenance Projects<br />
Berry Hall window treatments Construction in Progress Cont. Maintenance<br />
Berry Hall Entrance Steps Complete Cont. Maintenance<br />
Commons Parking Lot & Construction in Progress<br />
Cont. Maintenance<br />
Streets<br />
Conference Equipment Construction in Progress Cont. Maintenance<br />
Food Service Equipment Pending Bids Cont. Maintenance<br />
Morey Hall<br />
Complete<br />
Cont. Maintenance<br />
ceiling/shower/doors<br />
Morey Hall Fire Alarm<br />
Construction in Progress<br />
Cont. Maintenance<br />
Upgrade<br />
Natatorium treads/doors/winds Complete Cont. Maintenance<br />
Pile Hall step repair Construction in Progress Cont. Maintenance<br />
Student Center carpet replace. Construction in Progress Cont. Maintenance<br />
Terrace Hall Tuckpoint Design Construction in Progress Cont. Maintenance<br />
Terrace Hall Tuckpointing Construction inProgress