Report Period: As of June 30, 2007<br />

CONTINGENCY MAINTENANCE PROJECTS PROGRESS REPORT<br />

Peru <strong>State</strong> <strong>College</strong><br />

Revenue Bond Facilities<br />

Approved Current<br />

Resolution Date and Project Description Amount Expenditures Reallocations Balance Status<br />

Resolution Date: 4/8/2005<br />

Open Projects:<br />

1. Campuswide Annual Inspections & Maint of Smoke Detectors, Fire Ex, Alarms $4,500.00 $1,456.00 $0.00 Complete<br />

2. Residence Halls, Student Center Repair/replace Steam, Hot Water, Soft Equip $30,000.00 $6,5<strong>14</strong>.07 Open<br />

3. Residence Halls, Student Center HVAC Repairs & Maint $9,000.00 $4,353.22 Open<br />

4. Residence Halls, Student Center Repair Roofs, Eaves, & Gutter <strong>System</strong>s $5,000.00 $1,808.00 $3,192.00 Open<br />

5. Residence Halls, Student Center Repair and Replace Furnishings $100,000.00 $0.00 Complete<br />

6. Student Center Replace Food Service Equipment $15,000.00 $3,500.00 $11,500.00 Open<br />

Resolution Date: 3/31/06<br />

Open Projects:<br />

1. Campuswide Annual Inspections & Maint of Smoke Detectors, Fire Ex, Alarms $4,500.00 $3,176.00 $1,324.00 Open<br />

2. Campuswide Repair and Repalce Sidewalks, Steps, Driveways, Parking Lots $28,850.00 $6,893.20 $0.00 Complete<br />

3. Residence Halls, Student Center HVAC Repairs & Maint $46,100.00 $17,454.78 $22,286.41 Open<br />

4. Residence Halls, Student Center Repair and Replace Furnishings $75,050.00 $8,223.87 $15,720.93 Open<br />

5. Replace Food Service Equipment $5,000.00 $76.05 $4,923.95 Open<br />

RESOLUTION TOTALS $323,000.00 $42,587.90 $0.00 $69,8<strong>14</strong>.58<br />

Descriptions to be used in Status column of Contingency Maintenance Projects Progress Report<br />

Open - to be used when project is still in progress<br />

Deferred - to be used when project will not be completed because funds have been used elsewhere<br />

Complete - to be used when project has been completed