6/7/07 Board Meeting Minutes<br />
Contract and Change Orders<br />
The following contracts and change orders were presented to the Board for information.<br />
Chadron <strong>State</strong> Contracts<br />
• Administration Building – (professional services – window replacement) -<br />
$28,000<br />
• Heat Plant – (access stairs to tunnel) - $9,000<br />
• Kent Hall – (chiller tie-in) - $22,199<br />
• Kline Building – (piping from central chilled water system to plate exchanger) -<br />
$18,559<br />
• Memorial Hall – (professional design services – roof repair) - $34,150<br />
• Memorial Hall – (professional design services – chiller tie-in) - $<strong>13</strong>,850<br />
Peru <strong>State</strong> Contracts<br />
• T.J. Majors Building – (design fire sprinkler system) - $22,000 plus<br />
reimbursables not to exceed $5,000<br />
• Al Wheeler Activity Center – (renovation and addition) - $5,6<strong>13</strong>,000<br />
• Campus Services – (emergency power generator and installation) - $533,000<br />
Wayne <strong>State</strong> Contracts<br />
• Campus Services – (asbestos testing) - $3,640<br />
• Pile Hall – (rebuild and repair north steps) - $9,510.53<br />
• Peterson Fine Arts – (rebuild and repair northeast retaining wall) - $9,200<br />
• Campuswide – (street and sidewalk repairs) - $1,610,300 (Board authorized<br />
Chancellor to sign at April 2007 meeting)<br />
Chadron <strong>State</strong> Change Orders<br />
• Sparks Hall – (#5 concrete work, windows, electrical, additional demo) -<br />
$<strong>13</strong>,562<br />
• Kline Building – (#1 additional PVC to plate exchanger) - $4,206.71<br />
Peru <strong>State</strong> Change Order<br />
• Al Wheeler Activity Center – (#1 value engineer) – ($107,802) deduct<br />
Wayne <strong>State</strong> Change Orders<br />
• Campus Services – (#1 additional dirtwork, tree/shrub removal and utility<br />
credit) - $<strong>13</strong>,995<br />
• Campus Services – (#3 sewer and state fire marshall adjustments; and LB<br />
1100 credit) – ($89,392) deduct<br />
Grant Applications<br />
The following grant application was presented to the Board for information.<br />
Chadron <strong>State</strong> Application<br />
• Comprehensively Promoting Well-Being through Mexican Family Advocacy: A<br />
Pilot Immigrant/Refugee Neighborhood Project (Robert Wood Johnson) -<br />
$300,000<br />
16