7.4.-5<br />

PHYSICAL PLANT STATUS REPORT<br />

<strong>College</strong>: Wayne <strong>State</strong> <strong>College</strong> (continued) Meeting Date: Sept. <strong>13</strong>-<strong>14</strong>, 2007<br />

Other Capital Construction Projects<br />

(Include all projects using non-state or state funds that do not “fit” into any of the other categories)<br />

Baseball Scoreboard Installation Fall 2007 General Oper Budget<br />

Campus Entrance Digital Sign Installation <strong>September</strong> 2007 General Oper Budget<br />

Carhart Master Classroom Construction in Progress General Oper Budget<br />

Connell Exterior Wood Construction in Progress<br />

General Oper Budget<br />

Restoration<br />

Greywater Pending Engineer Selection Cash/Federal Funds<br />

Softball Locker Room Building Complete Private/Foundation