Chapter 4<br />

Developing and Restoring <strong>the</strong> Waterways Network<br />

Work started to automate Clarendon Lock, <strong>the</strong> only lock on <strong>the</strong> Boyle River between<br />

<strong>the</strong> confluence with <strong>the</strong> Shannon and Lough Key. This involved <strong>the</strong> development and<br />

fabrication of cofferdams <strong>for</strong> use on standard Lock Chambers in preparation <strong>for</strong> <strong>the</strong><br />

replacement of <strong>the</strong> lower gates in 2008. Tarmonbarry Lock House also underwent<br />

refurbishment with final works scheduled <strong>for</strong> completion in 2008. This refurbishment<br />

will provide improved visibility of <strong>the</strong> lock chamber <strong>for</strong> <strong>the</strong> lockkeeper when vessels are<br />

passing through as well as upgrading <strong>the</strong> existing welfare facilities.<br />

Works to facilitate <strong>the</strong> ease of passage to and from <strong>the</strong> Royal Canal upon its re-opening,<br />

included dredging of <strong>the</strong> lower section of Camlin River, in Co Long<strong>for</strong>d. In Scarriff,<br />

Co Clare, a boat pump out station was installed at Scarriff Harbour increasing <strong>the</strong> total<br />

number of pump out stations to 21 at 14 locations on <strong>the</strong> Shannon Navigation.<br />

Eastern Region<br />

4.1.6 Royal Canal<br />

In Co Long<strong>for</strong>d, works were completed on <strong>the</strong> construction of <strong>the</strong> new lifting bridge<br />

at Begnagh. Works also commenced on <strong>the</strong> replacement of <strong>the</strong> existing bridge at<br />

Mosstown.<br />

A 600m section of bank reconstruction and lining was carried out between Ballydrum<br />

Bridge and <strong>the</strong> 44th Lock near Killashee. Investigative works were completed at<br />

Richmond Harbour Dry Dock, a major restoration of <strong>the</strong> 45th Lock was completed and<br />

Cloonsheerin Culvert was fully restored. Negotiations continued with Westmeath<br />

County Council to provide an adequate water supply to <strong>the</strong> Royal Canal.<br />

24<br />

Waterways Ireland <strong>Annual</strong> Report and <strong>Accounts</strong> <strong>2007</strong>