16.11.2012 Views

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Order (only on approval by Exhibition Management)<br />

� Suspension from hall roof<br />

� Suspension point with power supply Qty ______________<br />

� Suspension point without power supply Qty ______________<br />

� Total weight of suspended item<br />

(maximum 30 kg per suspension point;<br />

the number of suspension points possible<br />

depends on the st<strong>and</strong> size <strong>and</strong> the hall<br />

kg ______________<br />

roof grid.)<br />

� Type of item suspended:<br />

(e.g. flags, banners, st<strong>and</strong> components,<br />

� as overleaf<br />

lighting cross-bars, etc.) � as overleaf<br />

–––––––––––––––––––––––––––––––––––––––––––––––––––<br />

–––––––––––––––––––––––––––––––––––––––––––––––––––<br />

Terms of Delivery <strong>and</strong> Payment<br />

St<strong>and</strong> installation/hire of material EUR<br />

Prices for installation on the st<strong>and</strong> including<br />

assembly, dismantling <strong>and</strong> hire fee<br />

1. Roof suspension point<br />

of galvanized steel cable, 3 mm, fitted with cable<br />

eye stiffeners, eyes or spring hooks as required<br />

1.1 Suspension point without power supply 103.00<br />

1.2 Power supply up to 3 kW 65.00<br />

1.3 10 or more suspension points offer on request<br />

1.4 Electric chain hoists offer on request<br />

2. Spot lights, lights for roof suspension<br />

including installation <strong>and</strong> dismantling<br />

plus power supply (see Form 1) <strong>and</strong> suspension<br />

2.1 Hired material<br />

HQI-Spot 150 W 49.00<br />

Halogen spot 300 W 49.00<br />

Halogen spot 500 W 61.00<br />

Halogen spot 1000 W 65.00<br />

See Form 8 for other spot lights<br />

2.2 Special lighting on request<br />

Bestellung (nur mit Genehmigung der Ausstellungsleitung)<br />

� Spot lights, lights for roof suspension<br />

� Installation of hired material<br />

HQI-Spot 150 W Qty ______________<br />

Halogen spot 300 W Qty ______________<br />

Halogen spot 500 W Qty ______________<br />

Halogen spot 1000 W Qty ______________<br />

Special lighting Qty ______________<br />

(by arrangement)<br />

� Work platform, assembling lift<br />

� Installation of exhibitor's own material<br />

_____________________________ Qty ______________<br />

_____________________________ Qty ______________<br />

Place <strong>and</strong> date Company stamp <strong>and</strong> binding authorized signature<br />

EUR<br />

3. Crossbar<br />

3.1 2-Point-Crossbar per meter 25.00<br />

3.2 3-Point-Crossbar per meter 35.00<br />

3.3 4-Point-Crossbar per meter 45.00<br />

4. Working plattform, assembling lift<br />

4.1 Self-propelled hydraulic work platform<br />

including operating personnel<br />

(only for hire with personnel)<br />

per hour 75.00<br />

4.2 Scissor platform lift up to 10 m on request<br />

4.3 Genie (Assembling lift), 6.50 m, 200 kg 1 day 80.00<br />

3 h 50.00<br />

5. Electrical fitter per hour 34.00<br />

The prices stated are for exhibition halls.<br />

All further work will be charged according to time <strong>and</strong> material<br />

expended. The hourly rate of € 33.00 includes all surcharges such as<br />

overtime hours, Sundays <strong>and</strong> public holidays.<br />

Surcharge for services not known at the time specified for the start of assembly<br />

or which could not be started at this time due to incomplete or unclear<br />

order information:<br />

a) Work at hourly rates 50 %<br />

b) Services at fixed prices 100 %<br />

All prices plus VAT at the statutory rate.<br />

See Form 1 in the Exhibitor’s Manual for further terms of business.<br />

Please note ”Information from A - Z” <strong>and</strong> ”<strong>Technical</strong> Guidelines -<br />

St<strong>and</strong> Instructions” in the Exhibitor’s Manual.<br />

The approved contractor settles accounts during the exhibition. Your<br />

st<strong>and</strong> personnel should therefore be provided with sufficient cash<br />

funds for this purpose.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!