Deadlines Orderforms Technical guidelines Assembly and - Interlift
Deadlines Orderforms Technical guidelines Assembly and - Interlift
Deadlines Orderforms Technical guidelines Assembly and - Interlift
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Order (only on approval by Exhibition Management)<br />
� Suspension from hall roof<br />
� Suspension point with power supply Qty ______________<br />
� Suspension point without power supply Qty ______________<br />
� Total weight of suspended item<br />
(maximum 30 kg per suspension point;<br />
the number of suspension points possible<br />
depends on the st<strong>and</strong> size <strong>and</strong> the hall<br />
kg ______________<br />
roof grid.)<br />
� Type of item suspended:<br />
(e.g. flags, banners, st<strong>and</strong> components,<br />
� as overleaf<br />
lighting cross-bars, etc.) � as overleaf<br />
–––––––––––––––––––––––––––––––––––––––––––––––––––<br />
–––––––––––––––––––––––––––––––––––––––––––––––––––<br />
Terms of Delivery <strong>and</strong> Payment<br />
St<strong>and</strong> installation/hire of material EUR<br />
Prices for installation on the st<strong>and</strong> including<br />
assembly, dismantling <strong>and</strong> hire fee<br />
1. Roof suspension point<br />
of galvanized steel cable, 3 mm, fitted with cable<br />
eye stiffeners, eyes or spring hooks as required<br />
1.1 Suspension point without power supply 103.00<br />
1.2 Power supply up to 3 kW 65.00<br />
1.3 10 or more suspension points offer on request<br />
1.4 Electric chain hoists offer on request<br />
2. Spot lights, lights for roof suspension<br />
including installation <strong>and</strong> dismantling<br />
plus power supply (see Form 1) <strong>and</strong> suspension<br />
2.1 Hired material<br />
HQI-Spot 150 W 49.00<br />
Halogen spot 300 W 49.00<br />
Halogen spot 500 W 61.00<br />
Halogen spot 1000 W 65.00<br />
See Form 8 for other spot lights<br />
2.2 Special lighting on request<br />
Bestellung (nur mit Genehmigung der Ausstellungsleitung)<br />
� Spot lights, lights for roof suspension<br />
� Installation of hired material<br />
HQI-Spot 150 W Qty ______________<br />
Halogen spot 300 W Qty ______________<br />
Halogen spot 500 W Qty ______________<br />
Halogen spot 1000 W Qty ______________<br />
Special lighting Qty ______________<br />
(by arrangement)<br />
� Work platform, assembling lift<br />
� Installation of exhibitor's own material<br />
_____________________________ Qty ______________<br />
_____________________________ Qty ______________<br />
Place <strong>and</strong> date Company stamp <strong>and</strong> binding authorized signature<br />
EUR<br />
3. Crossbar<br />
3.1 2-Point-Crossbar per meter 25.00<br />
3.2 3-Point-Crossbar per meter 35.00<br />
3.3 4-Point-Crossbar per meter 45.00<br />
4. Working plattform, assembling lift<br />
4.1 Self-propelled hydraulic work platform<br />
including operating personnel<br />
(only for hire with personnel)<br />
per hour 75.00<br />
4.2 Scissor platform lift up to 10 m on request<br />
4.3 Genie (Assembling lift), 6.50 m, 200 kg 1 day 80.00<br />
3 h 50.00<br />
5. Electrical fitter per hour 34.00<br />
The prices stated are for exhibition halls.<br />
All further work will be charged according to time <strong>and</strong> material<br />
expended. The hourly rate of € 33.00 includes all surcharges such as<br />
overtime hours, Sundays <strong>and</strong> public holidays.<br />
Surcharge for services not known at the time specified for the start of assembly<br />
or which could not be started at this time due to incomplete or unclear<br />
order information:<br />
a) Work at hourly rates 50 %<br />
b) Services at fixed prices 100 %<br />
All prices plus VAT at the statutory rate.<br />
See Form 1 in the Exhibitor’s Manual for further terms of business.<br />
Please note ”Information from A - Z” <strong>and</strong> ”<strong>Technical</strong> Guidelines -<br />
St<strong>and</strong> Instructions” in the Exhibitor’s Manual.<br />
The approved contractor settles accounts during the exhibition. Your<br />
st<strong>and</strong> personnel should therefore be provided with sufficient cash<br />
funds for this purpose.