Deadlines Orderforms Technical guidelines Assembly and - Interlift
Deadlines Orderforms Technical guidelines Assembly and - Interlift
Deadlines Orderforms Technical guidelines Assembly and - Interlift
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Return to<br />
AFAG Messen und Ausstellungen GmbH<br />
Messezentrum<br />
D-86159 Augsburg<br />
Tel +49 (0) 8 21. 5 89 82-343<br />
Fax +49 (0) 8 21. 5 89 82-308<br />
technik.interlift@afag.de<br />
Deadline<br />
2009-09-04<br />
for forwarding<br />
to our approved contractor<br />
2<br />
Water supply <strong>and</strong> drainage Submit in duplicate!<br />
Company: ________________________________________________________________________________________________________<br />
Address: __________________________________________________________________________________________________________<br />
Person responsible: __________________________________________________________________________________________________<br />
Tel: ______________________________________________<br />
/<br />
Fax: _____________________________________________<br />
/<br />
E-Mail: ___________________________________________<br />
Hall: St<strong>and</strong>:<br />
We order in accordance with the terms overleaf:<br />
� Water supply � Additional water supply � Drainage 1” � Only for filling pool<br />
stop valve (stub pipe) (ø 50 mm)<br />
1/2’’ � 3/4’’ � yes � yes � no � � ___________________ m 3<br />
� Connection of own equipment: � Connection of hired equipment:<br />
(or by st<strong>and</strong> construction company) (supplied by Stadtwerke Augsburg)<br />
� single sink � wash-basin/sink basin<br />
� double sink � chrome nickel steel sink with water boiler<br />
� water heater<br />
� dishwasher<br />
Please indicate the exact position of the desired connections on Form 2a.<br />
� The following additional work is to be carried out by Stadtwerke Augsburg at the hourly rate:<br />
___________________________________________________________________________________________________________________<br />
___________________________________________________________________________________________________________________<br />
___________________________________________________________________________________________________________________<br />
The installation company is entitled to claim a surcharge for fixed price services that are not known on the specified assembly date or cannot be started at<br />
this time due to incomplete or unclear order information.<br />
Approved contractor:<br />
Stadtwerke Augsburg<br />
Abt. SG - HS<br />
Hoher Weg 1<br />
86152 Augsburg<br />
Tel +49 (0) 8 21. 3 24-80 84 oder 80 86<br />
Fax +49 (0) 8 21. 3 24-80 85<br />
Mobil +49 (0) 1 73. 3 59 81 48<br />
Self-installation is not permitted for safety reasons.<br />
Water installations in the open-air ground are not warranted.<br />
Important! Plan must be submitted with order.<br />
Place <strong>and</strong> date Company stamp <strong>and</strong> authorized signature of applicant<br />
Please turn over!