16.11.2012 Views

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

Deadlines Orderforms Technical guidelines Assembly and - Interlift

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Return to<br />

AFAG Messen und Ausstellungen GmbH<br />

Messezentrum<br />

D-86159 Augsburg<br />

Tel +49 (0) 8 21. 5 89 82-343<br />

Fax +49 (0) 8 21. 5 89 82-308<br />

technik.interlift@afag.de<br />

Deadline<br />

2009-09-04<br />

for forwarding<br />

to our approved contractor<br />

2<br />

Water supply <strong>and</strong> drainage Submit in duplicate!<br />

Company: ________________________________________________________________________________________________________<br />

Address: __________________________________________________________________________________________________________<br />

Person responsible: __________________________________________________________________________________________________<br />

Tel: ______________________________________________<br />

/<br />

Fax: _____________________________________________<br />

/<br />

E-Mail: ___________________________________________<br />

Hall: St<strong>and</strong>:<br />

We order in accordance with the terms overleaf:<br />

� Water supply � Additional water supply � Drainage 1” � Only for filling pool<br />

stop valve (stub pipe) (ø 50 mm)<br />

1/2’’ � 3/4’’ � yes � yes � no � � ___________________ m 3<br />

� Connection of own equipment: � Connection of hired equipment:<br />

(or by st<strong>and</strong> construction company) (supplied by Stadtwerke Augsburg)<br />

� single sink � wash-basin/sink basin<br />

� double sink � chrome nickel steel sink with water boiler<br />

� water heater<br />

� dishwasher<br />

Please indicate the exact position of the desired connections on Form 2a.<br />

� The following additional work is to be carried out by Stadtwerke Augsburg at the hourly rate:<br />

___________________________________________________________________________________________________________________<br />

___________________________________________________________________________________________________________________<br />

___________________________________________________________________________________________________________________<br />

The installation company is entitled to claim a surcharge for fixed price services that are not known on the specified assembly date or cannot be started at<br />

this time due to incomplete or unclear order information.<br />

Approved contractor:<br />

Stadtwerke Augsburg<br />

Abt. SG - HS<br />

Hoher Weg 1<br />

86152 Augsburg<br />

Tel +49 (0) 8 21. 3 24-80 84 oder 80 86<br />

Fax +49 (0) 8 21. 3 24-80 85<br />

Mobil +49 (0) 1 73. 3 59 81 48<br />

Self-installation is not permitted for safety reasons.<br />

Water installations in the open-air ground are not warranted.<br />

Important! Plan must be submitted with order.<br />

Place <strong>and</strong> date Company stamp <strong>and</strong> authorized signature of applicant<br />

Please turn over!

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!