18.05.2015 Views

instruction manual - Hangar 9

instruction manual - Hangar 9

instruction manual - Hangar 9

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Section 11: Installing The Horizontal & Vertical Stabilizers<br />

Parts Needed<br />

Fuselage<br />

Horizontal Stabilizer Assembly<br />

Vertical Stabilizer Assembly<br />

Tools Needed<br />

Hobby Knife<br />

Ruler<br />

30-Minute Epoxy<br />

90-Degree Triangle<br />

Pencil<br />

Rubbing Alcohol<br />

Paper Towels<br />

❑ 1.<br />

Using a hobby knife, carefully cut out the covering at<br />

the front of the horizontal stabilizer slot as shown. The<br />

vertical stabilizer will later be inserted into this slot.<br />

❑ 3.<br />

Position the horizontal stabilizer in place on the<br />

fuselage and trial fit the vertical stabilizer in place.<br />

Using a pencil, mark where the horizontal stabilizer and<br />

vertical stabilizer meet on the vertical fin on both sides.<br />

❑ 2.<br />

Using a hobby knife, carefully cut out the openings on<br />

the top rear of the fuselage. Also, cut out the plywood<br />

section in the rear-most slot. The rear-most cutout is<br />

where the vertical fin will fit; the forward cutout is for<br />

the rudder pushrod exit.<br />

❑ 4.<br />

Remove the vertical stabilizer and cut away the covering<br />

below the marked section. Be careful not to cut into the<br />

wood. A ruler is helpful in making a straight cut.<br />

25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!