11<br />

13. Filter frame properly installed <strong>and</strong> sealed.<br />

14. Coils cleaned <strong>and</strong> properly installed.<br />

15. Drive components installed.<br />

16. Sheaves properly aligned <strong>and</strong> tight on their shafts.<br />

17. Verify correct fan rotations <strong>and</strong> speeds.<br />

18. Belts adjusted for the correct tension.<br />

19. Belt guard properly installed.<br />

20. Automatic control dampers installed <strong>and</strong> functional.<br />

21. Fan vortex dampers functional.<br />

22. Fan housings installed <strong>and</strong> properly sealed according to the drawings <strong>and</strong><br />

specifications.<br />

23. Flexible connections installed properly.<br />

24. Fan wheel aligned properly <strong>and</strong> adequate clearance in the housing.<br />

25. Fan bearing lubricated<br />

26. Check motor amperages <strong>and</strong> voltages; make necessary adjustments.<br />

<strong>Water</strong> Side<br />

1. Strainers <strong>and</strong> piping free from debris, cleaned, <strong>and</strong> flushed.<br />

2. Set all balancing devices to full open position.<br />

3. Construction strainer baskets replaced with permanent baskets.<br />

4. Set mixing valves <strong>and</strong> control valves to full coil flow; close coil by-pass valves.<br />

5. <strong>System</strong> filled to the proper level <strong>and</strong> the pressure-reducing valve set.<br />

6. Automatic <strong>and</strong> manual air vents properly installed <strong>and</strong> functional<br />

7. All air purged from the system.<br />

8. <strong>Water</strong> in the expansion tanks at the proper level.<br />

9. All valves, flow meters, <strong>and</strong> temperature/pressure tap installed correctly, accessible<br />

<strong>and</strong> functional.<br />

10. Terminal coils installed, piped correctly, <strong>and</strong> accessible.<br />

11. Pumps properly aligned, grouted <strong>and</strong> anchored.<br />

12. Verify correct pump rotations <strong>and</strong> proper drive alignments.<br />

13. Vibration isolators properly installed <strong>and</strong> adjusted.<br />

14. Flexible connections installed properly.<br />

15. Measure <strong>and</strong> record pump motor amperages <strong>and</strong> voltages.<br />

16. Check pump flow before balancing coils.<br />

17. Proceed with air systems balancing.<br />

Boiler<br />

1. All operating <strong>and</strong> safety setting for temperature <strong>and</strong> pressure are correct.<br />

2. Pressure relief valve functional.<br />

3. Boiler started <strong>and</strong> operating properly.<br />

Chiller <strong>and</strong> Condenser<br />

11