13. Filter frame properly installed <strong>and</strong> sealed.<br />
14. Coils cleaned <strong>and</strong> properly installed.<br />
15. Drive components installed.<br />
16. Sheaves properly aligned <strong>and</strong> tight on their shafts.<br />
17. Verify correct fan rotations <strong>and</strong> speeds.<br />
18. Belts adjusted for the correct tension.<br />
19. Belt guard properly installed.<br />
20. Automatic control dampers installed <strong>and</strong> functional.<br />
21. Fan vortex dampers functional.<br />
22. Fan housings installed <strong>and</strong> properly sealed according to the drawings <strong>and</strong><br />
specifications.<br />
23. Flexible connections installed properly.<br />
24. Fan wheel aligned properly <strong>and</strong> adequate clearance in the housing.<br />
25. Fan bearing lubricated<br />
26. Check motor amperages <strong>and</strong> voltages; make necessary adjustments.<br />
<strong>Water</strong> Side<br />
1. Strainers <strong>and</strong> piping free from debris, cleaned, <strong>and</strong> flushed.<br />
2. Set all balancing devices to full open position.<br />
3. Construction strainer baskets replaced with permanent baskets.<br />
4. Set mixing valves <strong>and</strong> control valves to full coil flow; close coil by-pass valves.<br />
5. <strong>System</strong> filled to the proper level <strong>and</strong> the pressure-reducing valve set.<br />
6. Automatic <strong>and</strong> manual air vents properly installed <strong>and</strong> functional<br />
7. All air purged from the system.<br />
8. <strong>Water</strong> in the expansion tanks at the proper level.<br />
9. All valves, flow meters, <strong>and</strong> temperature/pressure tap installed correctly, accessible<br />
<strong>and</strong> functional.<br />
10. Terminal coils installed, piped correctly, <strong>and</strong> accessible.<br />
11. Pumps properly aligned, grouted <strong>and</strong> anchored.<br />
12. Verify correct pump rotations <strong>and</strong> proper drive alignments.<br />
13. Vibration isolators properly installed <strong>and</strong> adjusted.<br />
14. Flexible connections installed properly.<br />
15. Measure <strong>and</strong> record pump motor amperages <strong>and</strong> voltages.<br />
16. Check pump flow before balancing coils.<br />
17. Proceed with air systems balancing.<br />
Boiler<br />
1. All operating <strong>and</strong> safety setting for temperature <strong>and</strong> pressure are correct.<br />
2. Pressure relief valve functional.<br />
3. Boiler started <strong>and</strong> operating properly.<br />
Chiller <strong>and</strong> Condenser<br />