10.07.2015 Views

IAGC LAND GEOPHYSICAL SAFETY MANUAL Edition 9 ... - CGISS

IAGC LAND GEOPHYSICAL SAFETY MANUAL Edition 9 ... - CGISS

IAGC LAND GEOPHYSICAL SAFETY MANUAL Edition 9 ... - CGISS

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1) The Worksite. Training can occur at the worksite where actual examples can beshown.2) The Crew Office/Shop/Loading Zone. Numerous crewmembers congregate justbefore work begins and at the conclusion of the workday, making it easy to conducttraining.3) Offsite. Offsite facilities tend to ensure attention and adequate visual aids. Offsitetraining is available in most areas, scheduling and course size limitations need to beconsidered.4) Headquarters. Corporate headquarters training can have a positive effect onawareness of top management commitment.3.7 Emergency ResponsePlanning reduces the potential for emergencies and their severity. Operators shouldprepare an Emergency Response Plan (ERP) during pre-survey planning. WhateverERP is generated, it must be consistent with ERPs that exist at higher levels and wherenecessary have references to them. Consider the following in developing theEmergency Response Plan:1) Events requiring emergency response during this project.a) Significant hydrocarbon spills.b) Other waste spills or environmental damage.c) Damage to wells, pipelines and other surface structures.d) Fires and explosions in base camp or the survey area.e) Medical evacuation.f) Severe weather such as lightning, hurricane, tropical storm, typhoon, etc.g) Earthquake and other possible natural disasters.Civil unrest.2) Resources, material and personnel required to recover from each of the above.3) Determine resource location and assign individuals with authority to accessresources on activating the Emergency Response Plan (ERP).4) If needed, make the Emergency Response Plan (ERP) a booklet, include maps ofthe prospect area, significant access, local hospitals, helicopter landing zones withsurvey coordinates, etc.5) Contact names and telephone numbers of key personnel from the contractor andclient.6) Define key steps and procedures needed to recover from these incidents.7) Assign an Emergency Response Coordinator for each work location.The Emergency Response Plan (ERP) should be posted at each notice board andcopies kept with every radio and vehicle. Emergency Response Plan (ERP) trainingshould be given to all inductees ducted at job start and at regular intervals thereafter orPage 37 of 136

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!