11.07.2015 Views

2 - Big Ass Fans

2 - Big Ass Fans

2 - Big Ass Fans

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8’–24’ POWERFOIL ® X2.0 & 10’–24’ POWERFOIL ® X2.0PLUS FANSMounting Structure: Bar Joists (cont.)174b. Fasten double angle irons to roof structureFasten the angle irons to the roof structure mounting points at each end with customer-supplied Grade 8 hardware as shown. The angleirons with fan mounting holes should be positioned on the inside, facing each other. Do not tighten the hardware until the upper yokehas been mounted to the angle irons.Grade 8 Hardware (Customer-Supplied):a. (8) 1/2-13 Boltb. (16) 1/2” Washerc. (8) 3” Square Washer (BAF-Supplied; see diagram)d. (8) 1/2” Nylock NutSquare Washer3”(7.6 cm)Ø 9/16”(1.4 cm)3”(7.6 cm)abThickness:1/4” (6 mm)cbdWWW.BIGASSFANS.COM ©2012 DELTA T CORP. DBA BIG ASS FAN CO. ALL RIGHTS RESERVED

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!