D E S C R I P T I O N O F W O R K - MEGAPOLI - Dmi
D E S C R I P T I O N O F W O R K - MEGAPOLI - Dmi
D E S C R I P T I O N O F W O R K - MEGAPOLI - Dmi
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>MEGAPOLI</strong> 212520<br />
B.1.3.5 Deliverables List<br />
Former Table 1.3 b: Deliverables List<br />
Del.<br />
no. 2<br />
List of Deliverables – to be submitted for review to EC 1<br />
Deliverable name WP<br />
no.<br />
D1.1 Base year global gridded emission<br />
inventory (1 st version)<br />
D1.2 Base year European gridded emission<br />
inventory (1 st version)<br />
D1.3 European and mega city baseline<br />
scenarios for 2020, 2030 and 2050<br />
29<br />
Lead<br />
beneficiary<br />
Estimated<br />
indicative<br />
personmonths<br />
3<br />
Nature Dissemi<br />
-nation<br />
level<br />
4<br />
1 TNO 4 P PP 12<br />
1 TNO 4 P PP 12<br />
1 USTUT 5 R PU 18<br />
D1.4 European heat flux inventory 1 KCL 4 P PP 18<br />
D1.5 Global emission inventory (final<br />
version)<br />
D1.6<br />
European emission inventory (final<br />
version)<br />
D2.1<br />
D2.2<br />
D2.3<br />
D2.4<br />
D2.5<br />
Morphology database for a target<br />
megacity<br />
Hierarchy of urban canopy<br />
parameterisations for different scale<br />
(LES, meso, and climate) models<br />
Evaluation of surface flux balance<br />
modelling and urban features<br />
needed for climate and air quality<br />
models<br />
Urbanized turbulence-resolving model<br />
and evaluation against WP3 Paris<br />
plume data<br />
Improved urban parameterizations<br />
based on prognostic equations,<br />
utilizing LES results<br />
1 TNO 9 R PP 24<br />
1 TNO 7 R PP 24<br />
33<br />
2 FMI 12 P PP 18<br />
2 FMI 6 R PU 18<br />
2 KCL 5 R PU 18<br />
2 NERSC 10 P<br />
Delivery<br />
date 5<br />
(proj.<br />
month)<br />
PU 18, 36<br />
2 NERSC 12 P PU 32<br />
1 1<br />
In a project which uses ‘Classified information ’ as background or which produces this as foreground the<br />
template for the deliverables list in Annex 7 has to be used<br />
2<br />
Deliverable numbers in order of delivery dates: D1 – Dn<br />
3<br />
Please indicate the nature of the deliverable using one of the following codes:<br />
R = Report, P = Prototype, D = Demonstrator, O = Other<br />
4<br />
Please indicate the dissemination level using one of the following codes:<br />
PU = Public<br />
PP = Restricted to other programme participants (including the Commission Services)<br />
RE = Restricted to a group specified by the consortium (including the Commission Services)<br />
CO = Confidential, only for members of the consortium (including the Commission Services)<br />
5<br />
Month in which the deliverables will be available. Month 1 marking the start date of the project, and all delivery<br />
dates being relative to this start date.