D E S C R I P T I O N O F W O R K - MEGAPOLI - Dmi
D E S C R I P T I O N O F W O R K - MEGAPOLI - Dmi
D E S C R I P T I O N O F W O R K - MEGAPOLI - Dmi
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>MEGAPOLI</strong> 212520<br />
B.1.3.8 List of milestones and planning of reviews<br />
Milestone<br />
no.<br />
Milestone name WPs<br />
no's.<br />
M 1.1 Workshop on<br />
evaluation of first<br />
version of<br />
European emission<br />
inventories<br />
M2.1 Internal discussions<br />
concluded on<br />
evaluation and<br />
formulation of<br />
urban<br />
parameterisations<br />
for different scale<br />
models<br />
M3.1 Paris Plume<br />
Experiment: initial<br />
stage<br />
M3.2 Paris Plume<br />
experiment:<br />
campaigns<br />
(winter + summer)<br />
M4.1 Selection of a<br />
Megacity for<br />
exposure estimates<br />
and mapping<br />
M5.1 Selecting key<br />
improvements to<br />
undertake for<br />
regional and global<br />
models for<br />
megacities plumes<br />
M6.1 Determination of<br />
tradeoffs between<br />
different model<br />
setups and optimal<br />
configurations for<br />
further simulations<br />
of regional and<br />
global climate<br />
changes due to<br />
megacities<br />
List and schedule of milestones<br />
1, 5,<br />
6<br />
2, 3-<br />
6<br />
Lead<br />
beneficiary<br />
TNO,<br />
USTUTT<br />
3 CNRS,<br />
DMI 24<br />
PSI<br />
3 CNRS,<br />
PSI<br />
57<br />
Delivery date<br />
Comments<br />
from Annex I<br />
1<br />
18 Will result in internal<br />
recommendation report<br />
12 Preparing the measurement<br />
programme, instrumental base,<br />
equipment calibration and test<br />
measurements<br />
21 Determination of exact timing<br />
of and participation in<br />
campaigns in preparatory<br />
workshops<br />
4, 7 FMI, AUTH 18 Based on preliminary<br />
population exposure,<br />
dose/intake estimates and<br />
available maps one megacity<br />
will be selected<br />
5 NILU, FMI 18<br />
6, 1,<br />
5<br />
MetO,<br />
ICTP<br />
18 If needed, will be supported<br />
with a workshop to discuss the<br />
results<br />
1<br />
Month in which the milestone will be achieved. Month 1 marking the start date of the project, and all delivery<br />
dates being relative to this start date.