12.07.2015 Views

Highway 99 Beautification Master Plan - Council of Fresno County ...

Highway 99 Beautification Master Plan - Council of Fresno County ...

Highway 99 Beautification Master Plan - Council of Fresno County ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

e applied to other corridors in the county.<strong>Highway</strong> <strong>99</strong><strong>Beautification</strong><strong>Master</strong> <strong>Plan</strong>In the spring <strong>of</strong> 1<strong>99</strong>9 the group sent out a Request for Proposals (RFP) to qualified design firms to assist them inthe preparation <strong>of</strong> the <strong>Beautification</strong> <strong>Plan</strong>. After a thorough review and selection process, the Associationselected RRM Design Group to assist them in the preparation <strong>of</strong> the <strong>Plan</strong>. RRM’s team <strong>of</strong> landscape architectsand planners worked with the Association and <strong>Fresno</strong> COG in the preparation <strong>of</strong> this document through frequentreview <strong>of</strong> the work progress and products. The <strong>Plan</strong>’s work program was broken down into several phaseswhich are described in the following summary.PHASE IGoals and ObjectivesPhase I began with a start-up meeting with the Association in which the RRM design team collected additionalinformation, clarified timelines and milestones, and engaged in a brainstorming session on goals, objectives andproject boundary issues for the <strong>Master</strong> <strong>Plan</strong>. The second portion <strong>of</strong> this phase consisted <strong>of</strong> fieldwork and aninventory <strong>of</strong> existing conditions. RRM Design Group performed a thorough site review <strong>of</strong> the existing conditionsthroughout the <strong>Highway</strong> <strong>99</strong> Corridor study area. This included field notes, videotape and photographs <strong>of</strong> the studyarea as well as compilation <strong>of</strong> existing <strong>Highway</strong> <strong>99</strong> Corridor aerial photographs.AppendixPHASE IIExisting ConditionsThe second phase consisted <strong>of</strong> an Opportunity and Constraints Analysis. RRM Design Group analyzed theAppendixThe <strong>Plan</strong>ningProcessThe <strong>Plan</strong>ning Process8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!