oth national and international interest.<br />

• Holistic approach: The project must take<br />

due regard of lifecycle costs.<br />

• Duration of the contract: Approximately 25<br />

years should be permitted, with no<br />

reconstruction in the near future.<br />

• Final financing: This should be through<br />

cofinancing. Alternatively, user fees could<br />

finance all or part of the investment.<br />

Pipeline Of Potential PPP Projects<br />

The working group identified four projects it<br />

believed to fulfill all key criteria (see table 2).<br />

The working group subsequently identified<br />

projects that could be suitable for PPP, but that<br />

do not currently fulfill all essential criteria<br />

(see table 3).<br />

Similarly, the working group identified railroad<br />

projects that should be continually evaluated as to<br />

their suitability for PPP financing. These are:<br />

Railroad East (Ostlänken); Railroad Norrbotten<br />

(Norrbotniabanan); a railroad between Mölnlycke<br />

and Rävlanda/Bollebygd; a railroad between<br />

Malmö, Staffanstorp, and Dalby<br />

(Simrishamnsbanan); and combination terminals<br />

and connections to harbors. ■<br />

STANDARD & POOR’S EUROPEAN INFRASTRUCTURE FINANCE YEARBOOK<br />

PROJECT FINANCE/PUBLIC-PRIVATE PARTNERSHIPS<br />

Table 2 - Prospective Projects That Meet All Criteria For PPP Financing<br />

Length (kilometers) <strong>In</strong>vestment (mil. SEK) NNK* (x)<br />

Riksväg 50 road between Mjölby and Motala 28 1,330 1.4<br />

E22 motorway between Hurva and Kristianstad 41 (57) 1,100 (1,360) 0.7<br />

E4 Sundsvall South motorway 22 2,500 0.9<br />

Länsväg 259 Södertörn road 9 1,300 0.7<br />

*NNK (nettonuvärdeskvot) measures profitability and needs to be at least 0.5x. SEK--Swedish krona.<br />

Table 3 - Prospective Projects That Meet Some Criteria For PPP Financing<br />

Length (kilometers) <strong>In</strong>vestment (mil. SEK) NNK* (x)<br />

E22 motorway between Kristianstad and Karlshamn 53 1,430 0.5<br />

E22 motorway between Karlshamn and Jämjö 69 (74) 1,840 0.0<br />

E22 Söderköping motorway 17 700 0.7-1.9<br />

E6/45 new connection to river 1.5 2,500 2.2<br />

E20 motorway between Alingsås and Vårgårda 25 1,550 0.5<br />

E4 motorway between Hjulsta and Häggvik 7 4,500 0.2<br />

E4 motorway between Södertälje and Hallunda 15 3,300 N.A.<br />

E12 Umeå motorway (Umepaketet) 28 1,100 0.0-2.1<br />

*NNK (nettonuvärdeskvot) measures profitability and needs to be at least 0.5x. SEK--Swedish krona. N.A.--Not available.<br />