12.07.2015 Views

DTHC-SETUP/INSTALL MANUAL CandCNC

DTHC-SETUP/INSTALL MANUAL CandCNC

DTHC-SETUP/INSTALL MANUAL CandCNC

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>DTHC</strong> EXPANION MODULE. Locatedabove the UBOB III card in most <strong>CandCNC</strong>products.. Ribbon cable connecting <strong>DTHC</strong>down to UBOB card may cover adjustmentpots. If so, gently move it out out the way.Do not unplug the ribbon cable or the cardwill be disabled.Green Power LEDShold be ON2. Using the diagram below and with theDCP in the TEST/CAL mode (LEDflashing) adjust the DCP calibration potwhile watching the TORCH AMPS DRO inthe MACH screen. Adjust the pot until thevalue displayed is 100 AMPs.16 pin header (plug)for <strong>DTHC</strong> to UBOBCableYour calibration procedure is complete!<strong>DTHC</strong> Self TestLEDDB9 connector for cable toTHC SENSOR CARDDCP CalibrationPOT ADJUST perthe instructionsNO!TORCH VOLTS CalibrationDO NOT ADJUST THIS POT.Unit is calibrated at thefactory.PAGE 24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!