12.07.2015 Views

Buildings B

Buildings B

Buildings B

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Appendix 25Channels for Complaining against Unsatisfactory Performanceof ContractorsNature of Unsatisfactory Performance ofContractorComplainingchannels /parties/departmentsTelephone No.1.Poor site safety measures during construction stage,e.g. workers do not wear helmet, no safetybeltwhen working at height; no protectivescreen/hoarding to separate the public awayfrom the construction areaLabour Department2717 17712.3.4.Noise pollution from site activitiesAir pollution from site activitiesImproper discharge of waste water into public stormwater drainsEnvironmental ProtectionDepartmentRefer to DistrictComplaint Hotlines(Appendix 2)5.Bribery and CorruptionIndependent CommissionAgainst Corruption2526 63666.7.Carry out of illegal building works and works causingpossible danger to the building and the publicWork carried out in contravention with <strong>Buildings</strong>Ordinance<strong>Buildings</strong> Department2626 16168.Illegal use of water from hose reelWater SuppliesDepartment2824 5000Fire Services Department2723 87879.Employment of illegal immigrant in the constructionsiteImmigration Department2824 155110.Gambling in construction siteHong Kong Police ForceRefer to DistrictComplaint Hotlines(Appendix 2)11.12.13.14.Accumulation of construction debris without regulardisposalSlow progress of construction workWork carried out in contravention with the contractspecificationPoor workmanshipAppointed BuildingProfessional to discusspossible course of actionsunder contract, such aswithholding payment,termination, etc.N/AAppendix 25

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!