12.07.2015 Views

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the seventy third <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the State Level Expert Appraisal Committee, <strong>West</strong><strong>Bengal</strong> held <strong>on</strong> <strong>30.11.2012</strong> at 11:00 hrs. at the C<strong>on</strong>ference Room, Paribesh Bhawan, Salt Lake.___________________________________________________________________12. Proposed Residential Complex by M/s. Anant Shri Sukhramji Trust at 156B, Manicktala MainRoad, KMC Ward No. 32, PS – Manicktala, Kolkata – 700 054, <strong>West</strong> <strong>Bengal</strong>.Activity:This is a a proposal for c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> a Residential Complex comprising a fr<strong>on</strong>t residential block <str<strong>on</strong>g>of</str<strong>on</strong>g>B+G+23 storied building and a Rear Block <str<strong>on</strong>g>of</str<strong>on</strong>g> B+G+7 storied building.Chr<strong>on</strong>ology <str<strong>on</strong>g>of</str<strong>on</strong>g> the event :Salient features <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed project are –Land AreaExpected Populati<strong>on</strong>Total water requirementFresh water requirementWastewater generatedWaste water dischargedWastewater recycledSolid waste disposalTotal Built­up AreaGround CoverageRoad Area / Paved AreaSemi Paved Area (50%)Total S<str<strong>on</strong>g>of</str<strong>on</strong>g>t scape AreaTotal Hard scape AreaTree Plantati<strong>on</strong> AreaNo. <str<strong>on</strong>g>of</str<strong>on</strong>g> plantati<strong>on</strong> proposedNo. <str<strong>on</strong>g>of</str<strong>on</strong>g> Solar Street lightsproposed: 7468.87 sqm.: Fixed – 408 pers<strong>on</strong>s, Floating – 373 pers<strong>on</strong>s: 84 KLD (during operati<strong>on</strong>) & 50 KLD (during c<strong>on</strong>structi<strong>on</strong>): 84 KLD (KMC supply): 62 KLD: 62 KLD (to be discharged to municipal sewer): NIL: 365.5 kg. per day (through MSW disposal system): 28196.31 sqm. (including parking): 3359.06 sqm. (44.97% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 1356.62 sqm. (18.16% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 944.81 sqm. (12.65% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 2280.785 sqm. (30.54% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 1829.025 sqm. (24.49% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 1808.38 sqm. (24.21% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 130 trees (Species wise plantati<strong>on</strong> list submitted). 7 nos. <str<strong>on</strong>g>of</str<strong>on</strong>g> treesto be felled.: 3 nos. out <str<strong>on</strong>g>of</str<strong>on</strong>g> 13 nos.No. <str<strong>on</strong>g>of</str<strong>on</strong>g> Parking spaces proposed : 234 (covered – 149, open – 85)Total Power requirementBackup Power: 1100 KW, CESC: DG Sets (2x400 KW = 2x500 KVA)The prop<strong>on</strong>ent has delivered a powerpoint presentati<strong>on</strong> in the 72 nd <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> held <strong>on</strong> 18.10.2012and during presentati<strong>on</strong> in the 72 nd <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g>, the committee has recommended the following andthe subsequent reply submitted <strong>on</strong> 22.11.2012 <str<strong>on</strong>g>of</str<strong>on</strong>g> the project prop<strong>on</strong>ent is given below :–Page 27 <str<strong>on</strong>g>of</str<strong>on</strong>g> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!