12.07.2015 Views

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the seventy third <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the State Level Expert Appraisal Committee, <strong>West</strong><strong>Bengal</strong> held <strong>on</strong> <strong>30.11.2012</strong> at 11:00 hrs. at the C<strong>on</strong>ference Room, Paribesh Bhawan, Salt Lake.___________________________________________________________________Road AreaOther Green AreaExclusive Tree Plantati<strong>on</strong> AreaWater bodyOpen Parking Area: 4654.39 sqm. (21.01% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 2119.659 sqm. (9.57% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 4468.44 sqm. (20.17% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 792.43 sqm. (3.57% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 1712.5 sqm. (7.72% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area)No. <str<strong>on</strong>g>of</str<strong>on</strong>g> Parking Spaces proposed : 506 (covered 369, Open 137)No. <str<strong>on</strong>g>of</str<strong>on</strong>g> Trees to be plantedDaily Power requirementBackup Power: 312 nos.: 2500 KVA, CESC: DG Sets (1x1000 KVA and 2x500 KVA)RWH Details : Surface Storage – 1708 m 3Subsurface Recharge – 2597.4 m 3Depth <str<strong>on</strong>g>of</str<strong>on</strong>g> recharge well – 50 m, electro logging to be carried outCSR Proposed: Not proposedName <str<strong>on</strong>g>of</str<strong>on</strong>g> the Envir<strong>on</strong>mental C<strong>on</strong>sultant is M/s. Ghosh, Bose & Associates Pvt. Ltd. The case wasput up for c<strong>on</strong>siderati<strong>on</strong> in the 73 rd <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> held <strong>on</strong> <strong>30.11.2012</strong>. After carefully c<strong>on</strong>sideringthe proposal and presentati<strong>on</strong>, the committee recommended that1. Project prop<strong>on</strong>ent may c<strong>on</strong>sider installati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> more number <str<strong>on</strong>g>of</str<strong>on</strong>g> solar lights2. Detailed CSR programme to be submitted as discussed during the presentati<strong>on</strong>.It has been decided that the case shall be further c<strong>on</strong>sidered <strong>on</strong>ly after submissi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the necessarydocuments.5. Proposed expansi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Office Building (Phase – II) by M/s. Cognizant Technology Soluti<strong>on</strong>sIndia Pvt. Ltd. at JL No. 35, Mouza – Gangapur, PS – Kolkata Leather Complex, Dist – 24Parganas (South), <strong>West</strong> <strong>Bengal</strong>.Activity:This is a proposal for expansi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> Office Complex (Phase – II) c<strong>on</strong>sisting <str<strong>on</strong>g>of</str<strong>on</strong>g> 1 Block <str<strong>on</strong>g>of</str<strong>on</strong>g> G+8 StoriedBuilding. Phase – I <str<strong>on</strong>g>of</str<strong>on</strong>g> the project has already obtained Envir<strong>on</strong>mental Clearance. The project isregistered for Green Building Certificate under LEED India Inc.Chr<strong>on</strong>ology <str<strong>on</strong>g>of</str<strong>on</strong>g> the event :Salient features <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed project are –Phase I for which EC has beenissued vide No. EN/1802/T­II­1/164/2007 dated 02.07.2009Type <str<strong>on</strong>g>of</str<strong>on</strong>g> Building : SDB 1 & 2 (2 blocks <str<strong>on</strong>g>of</str<strong>on</strong>g> Stilt + 8storied building) canteen – 1 (G+2storied building). AncillaryPhase II for which applicati<strong>on</strong> forenvir<strong>on</strong>mental clearance applied<strong>on</strong> 27.04.2012: SDB 2 extensi<strong>on</strong> – G+8 storied,Dormitory G storied.Page 43 <str<strong>on</strong>g>of</str<strong>on</strong>g> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!