12.07.2015 Views

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the seventy third <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the State Level Expert Appraisal Committee, <strong>West</strong><strong>Bengal</strong> held <strong>on</strong> <strong>30.11.2012</strong> at 11:00 hrs. at the C<strong>on</strong>ference Room, Paribesh Bhawan, Salt Lake.___________________________________________________________________3. Relevant Office Memorandum No. J­103/19/2012­IA.III dated 01.11.2012 <str<strong>on</strong>g>of</str<strong>on</strong>g> the Ministry <str<strong>on</strong>g>of</str<strong>on</strong>g>Envir<strong>on</strong>ment & Forests, Government <str<strong>on</strong>g>of</str<strong>on</strong>g> India.To simplify the procedures relating to grant <str<strong>on</strong>g>of</str<strong>on</strong>g> EC <str<strong>on</strong>g>of</str<strong>on</strong>g> the SEZ projects under the provisi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> the EIANotificati<strong>on</strong> 2006, MoEF has decided to have the following framework in place, in line with thatprescribed for NIMZs under the Nati<strong>on</strong>al Manufacturing Policy, 2011 :­i. In respect <str<strong>on</strong>g>of</str<strong>on</strong>g> laws and regulati<strong>on</strong>s pertaining to envir<strong>on</strong>ment, Central/State Governments maydelegate the power as allowed by the relevant statutes to an <str<strong>on</strong>g>of</str<strong>on</strong>g>ficial <str<strong>on</strong>g>of</str<strong>on</strong>g> the SPCB posted in thez<strong>on</strong>e.ii.The EC for SEZs units under the EIA Notificati<strong>on</strong> 2006 shall be c<strong>on</strong>sidered <strong>on</strong> a high priority.iii. Individual units may be exempted from public hearing in cases where the SEZ as a whole hasunderg<strong>on</strong>e public hearing. In cases where the type <str<strong>on</strong>g>of</str<strong>on</strong>g> individual unit/process was not originallyc<strong>on</strong>sidered as a part <str<strong>on</strong>g>of</str<strong>on</strong>g> the SEZ project at the time <str<strong>on</strong>g>of</str<strong>on</strong>g> public hearing for SEZ, a fresh publichearing will be required for the individual unit/process at appropriate time.iv. Facilitative instructi<strong>on</strong>s and guidelines may be issued at the Central and State level from timeto time aiming at promoti<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> SEZs while safeguarding envir<strong>on</strong>mental integrity.Put up for discussi<strong>on</strong> in the 73 rd <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> held <strong>on</strong> <strong>30.11.2012</strong> and was noted by <str<strong>on</strong>g>SEAC</str<strong>on</strong>g>.B. Rec<strong>on</strong>siderati<strong>on</strong> Proposals :­Seventeen rec<strong>on</strong>siderati<strong>on</strong> proposals were placed in the <str<strong>on</strong>g>meeting</str<strong>on</strong>g>.Industry Sector :­1. Proposed Ir<strong>on</strong> Ore Beneficiati<strong>on</strong> plant <str<strong>on</strong>g>of</str<strong>on</strong>g> M/s. Onkar Udyog Ltd. at Vill. – Guptam<strong>on</strong>i, Jl. No. –638, Mouza – Jamsole, PS – Jhargram, Dist. – Paschim Medinipur, <strong>West</strong> <strong>Bengal</strong>.Activity:This is a proposal for installati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> an Ir<strong>on</strong> Ore Beneficiati<strong>on</strong> plant (20 TPH) with capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> 96000TPA throughout and about 70000 TPA ir<strong>on</strong> ore.Salient features <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed modernisati<strong>on</strong> project are :i. Locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Site – Vill. – Guptam<strong>on</strong>i, Jl. No. – 638, Mouza – Jamsole, PS – Jhargram, Dist. –Paschim Medinipur, <strong>West</strong> <strong>Bengal</strong>.ii. Land Area – 4 acres, 56 decimals. Green Area – 1.4 acres (36.60% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area). Total no. <str<strong>on</strong>g>of</str<strong>on</strong>g>saplings is 1750.iii. Raw Materials – Ir<strong>on</strong> ore fines (90000 TPA).iv. Emissi<strong>on</strong> Sources ­ Raw Material Handling Secti<strong>on</strong>, Transfer Points, Jaw Crusher (20 TPH),Roller Mill/ Ball Mill (20 TPH), HIM Separator, Belt C<strong>on</strong>veyor, Screen etc.v. Air Polluti<strong>on</strong> C<strong>on</strong>trol System – Adequate Dust Suppressi<strong>on</strong> System to be installed to c<strong>on</strong>trolfugitive emissi<strong>on</strong>s.vi. Total water requirement­82 m 3 /hr. Make up Water Requirement – 4 m 3 /hr(Source­ Groundwater).vii. Wastewater – domestic effluent to be discharged through septic tank to soak pit. , Process waterdischarge­ Zero effluent discharge­effluents from ore beneficiati<strong>on</strong> plant shall be treated inthickener and overflow to be recycled.viii. Solid waste:­ 28,800 MTPA rejects <str<strong>on</strong>g>of</str<strong>on</strong>g> the process. To be disposed <str<strong>on</strong>g>of</str<strong>on</strong>g> in landfilling <str<strong>on</strong>g>of</str<strong>on</strong>g> mines.ix. Power Source – 500 KVA, WBSEB.Page 3 <str<strong>on</strong>g>of</str<strong>on</strong>g> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!