12.07.2015 Views

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the seventy third <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the State Level Expert Appraisal Committee, <strong>West</strong><strong>Bengal</strong> held <strong>on</strong> <strong>30.11.2012</strong> at 11:00 hrs. at the C<strong>on</strong>ference Room, Paribesh Bhawan, Salt Lake.___________________________________________________________________Area for future expansi<strong>on</strong>Total Paved AreaPhase I for which EC has beenissued vide No. EN/1802/T­II­1/164/2007 dated 02.07.2009: 13045.62 sqm.(16.1% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area)Phase II for which applicati<strong>on</strong> forenvir<strong>on</strong>mental clearance applied<strong>on</strong> 27.04.2012: 9041.4 sqm.(11.14% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area): 20186.68 sqm.(24.88% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area)Total Green Area : : 29810.33 sqm.(36.74% <str<strong>on</strong>g>of</str<strong>on</strong>g> land area)No. <str<strong>on</strong>g>of</str<strong>on</strong>g> trees proposed to beplantedNo. <str<strong>on</strong>g>of</str<strong>on</strong>g> Parking spacesproposed: 2881 nos. (for Phase I & Phase II): Cars – 642, Bus – 18, TwoWheeler ­ 1240: Cars ­ 211, Bus ­ 1Total Power requirement : 6578 KVA, WBSEDCL : 425 KVA, WBSEDCLBackup Power: DG Sets (2 x 1500 KVA, 1 x1750 KVA & 1 x 2000 KVA): DG Sets (1x125 KVA, 1x250KVA)Rainwater Harvesting : : Surface Storage : 2 storage tank200 cum.Sub surface Recharge : Rechargingthrough 150 mm dia rechargetubewell (2 nos.) with 114 cumcapacity.Corporate SocialResp<strong>on</strong>sibility: : 36 lakhs in 3 years for Phase IINo. <str<strong>on</strong>g>of</str<strong>on</strong>g> solar lights : : 47 nosPresent status <str<strong>on</strong>g>of</str<strong>on</strong>g> theproject: NOC obtained from WBPCB <strong>on</strong>29.07.2009‘C<strong>on</strong>sent to Operate’ obtainedfrom WBPCB for Phase I <str<strong>on</strong>g>of</str<strong>on</strong>g> theproject with validity upto31/08/2013.The PP has sought amendment <str<strong>on</strong>g>of</str<strong>on</strong>g> EC Phase 1 <str<strong>on</strong>g>of</str<strong>on</strong>g> the project for the following change in waterc<strong>on</strong>sumpti<strong>on</strong> values –:Populati<strong>on</strong>Total water requirementFresh Water requirementDomestic water requirementWastewater generatedTreated wastewater6365 pers<strong>on</strong>s602 KLD – m<strong>on</strong>so<strong>on</strong>656 KLD – n<strong>on</strong>­m<strong>on</strong>so<strong>on</strong>312 KLD – m<strong>on</strong>so<strong>on</strong>366 KLD – n<strong>on</strong>­m<strong>on</strong>so<strong>on</strong>362 KLD290 KLD290 KLDPage 45 <str<strong>on</strong>g>of</str<strong>on</strong>g> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!