12.07.2015 Views

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the seventy third <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the State Level Expert Appraisal Committee, <strong>West</strong><strong>Bengal</strong> held <strong>on</strong> <strong>30.11.2012</strong> at 11:00 hrs. at the C<strong>on</strong>ference Room, Paribesh Bhawan, Salt Lake.___________________________________________________________________proposedAs per Provisi<strong>on</strong>alEnvir<strong>on</strong>mental Clearancedated 06.04.2010As per Sancti<strong>on</strong>ed Plan &documents submitted <strong>on</strong>25.09.2012Total Power requirement : 15000 KVA, WBSEDCPL : 15000 KVA, WBSEDCPLBackup Power: DG Sets (2 x 125 KVA, 8 x625 KVA, 1 x 1010 KVA, 2 x1500 KVA)C<strong>on</strong>structi<strong>on</strong> started : : Yes: DG Sets (2 x 125 KVA, 8 x 625KVA, 1 x 1010 KVA, 2 x 1500KVA)The case was placed for rec<strong>on</strong>siderati<strong>on</strong> in the 73 rd <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> held <strong>on</strong> <strong>30.11.2012</strong>. The <str<strong>on</strong>g>SEAC</str<strong>on</strong>g>c<strong>on</strong>sidered the submissi<strong>on</strong> by the prop<strong>on</strong>ent and recommended Envir<strong>on</strong>mental Clearance. It isnoted that c<strong>on</strong>structi<strong>on</strong> has been started. The same to be brought to the notice <str<strong>on</strong>g>of</str<strong>on</strong>g> SEIAA forappropriate acti<strong>on</strong>.Sessi<strong>on</strong> IIC. Technical Presentati<strong>on</strong>s: ­Industry Sector :­1. Proposed expansi<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> existing Water Based Paint Plant by M/s. Berger Paints India Ltd. at Jl.No. – 27, 103, G. T. Road, Vill – Rishra, Dist. ­ Hooghly, Pin – 712248, <strong>West</strong> <strong>Bengal</strong>.Activity:This is a proposal for enhancement <str<strong>on</strong>g>of</str<strong>on</strong>g> producti<strong>on</strong> capacity <str<strong>on</strong>g>of</str<strong>on</strong>g> Water Based Paint. Existing capacity –Liquid Paints : 1960 kl/m<strong>on</strong>th, Thinner : 30 kl/m<strong>on</strong>th, PTC : (<strong>on</strong>ly solid) : 20 t<strong>on</strong>nes / m<strong>on</strong>th, andPTC (<strong>on</strong>ly liquid) : 20 kl / m<strong>on</strong>th. Proposed capacity : 6500 kl/m<strong>on</strong>th.Chr<strong>on</strong>ology <str<strong>on</strong>g>of</str<strong>on</strong>g> the event :WBPCB has already accorded in principle approval for the proposedexpansi<strong>on</strong> project.Salient features <str<strong>on</strong>g>of</str<strong>on</strong>g> the proposed modernizati<strong>on</strong> project are :i. Locati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> the Site – Jl. No. – 27, 103, G. T. Road, Vill – Rishra, Dist. ­ Hooghly, Pin – 712248,<strong>West</strong> <strong>Bengal</strong>.ii.Area – 22764 sqm. (existing built up area), 2181.44 sqm. (proposed built up area), 42991 sqm.Command area (proposed).iii. Producti<strong>on</strong> Capacity – liquid paints – 4470 kl/m<strong>on</strong>th i.e. Total producti<strong>on</strong> capacity – 6430kl/m<strong>on</strong>th.iv. Emissi<strong>on</strong> Sources – Existing : Thermic Fluid Heaters – 1x10 lac Kcal/hr. & 2x6 lac Kcal/hr.,Boiler – 1x600 Kg/hr. DG Set – 1x500 KVA. All HSD fired.v. Proposed : DG Set 1x1000 KVA, HSD fired.vi. Air Polluti<strong>on</strong> C<strong>on</strong>trol System – Stacks <str<strong>on</strong>g>of</str<strong>on</strong>g> height 12m.vii. Water Requirement – Existing : 107 KLD (Fresh water), After expansi<strong>on</strong> – 131 KLD i.e.additi<strong>on</strong>al 24 KLD (recycled from ETP 24 KLD).viii. Wastewater discharge – Existing : 45 KLD. After expansi<strong>on</strong> – 65 KLD to be discharged at BaghKhal. Effluent generated will be treated in Effluent Treatment Plant and treated effluent will bePage 39 <str<strong>on</strong>g>of</str<strong>on</strong>g> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!