12.07.2015 Views

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

Minutes of 73rd SEAC meeting on 30.11.2012 - West Bengal ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Minutes</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the seventy third <str<strong>on</strong>g>meeting</str<strong>on</strong>g> <str<strong>on</strong>g>of</str<strong>on</strong>g> the State Level Expert Appraisal Committee, <strong>West</strong><strong>Bengal</strong> held <strong>on</strong> <strong>30.11.2012</strong> at 11:00 hrs. at the C<strong>on</strong>ference Room, Paribesh Bhawan, Salt Lake.___________________________________________________________________ii.Land Area – 25 acres (Existing ­12 acres & expansi<strong>on</strong>­13 acres within the existing plant).iii. Greenbelt Development – 33% <str<strong>on</strong>g>of</str<strong>on</strong>g> total land area i.e. 8.25 acres.iv. Raw Materials – Sp<strong>on</strong>ge Ir<strong>on</strong> (35 TPH), Pig Ir<strong>on</strong> / Scraps (15 H).v. Additi<strong>on</strong>al Producti<strong>on</strong> Capacity ­ MS Billets­123000 TPA & TMT bars­ 120000 TPA.vi. Air Polluti<strong>on</strong> C<strong>on</strong>trol Device –Fan (60000 Nm 3 /Hr), 2 nos. Spark Arrestor cum Cycl<strong>on</strong>eSeparator (60000 Nm 3 /Hr), Bag Filters (60000 Nm 3 /Hr), etc. and stack <str<strong>on</strong>g>of</str<strong>on</strong>g> height 30m from GL.vii. Total Water Requirement – 120 KLD, source : DVC.viii. Effluent – The waste water is treated through ETP and steeling p<strong>on</strong>d with 90% efficiency. Wastewater from cooling process <str<strong>on</strong>g>of</str<strong>on</strong>g> inducti<strong>on</strong> furnace will be used in greenbelt development.ix. Solid Waste – Solid waste from APCD will collected and used for landfilling. Slag frominducti<strong>on</strong> furnace will be sold.x. Power Requirement – 22 MVA, DVC. (Existing – 13.5 MVA)xi. Back­up Power – DG Sets (1x750 KVA & 1x500 KVA)After carefully c<strong>on</strong>sidering the presentati<strong>on</strong> in the 71 st <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> held <strong>on</strong> 24.09.2012, the StateLevel Expert Appraisal Committee (<str<strong>on</strong>g>SEAC</str<strong>on</strong>g>) made the following recommendati<strong>on</strong>s. Subsequentresp<strong>on</strong>se submitted <strong>on</strong> 22.11.2012 from the unit is given below :­Recommendati<strong>on</strong>s / Directi<strong>on</strong>s <str<strong>on</strong>g>of</str<strong>on</strong>g> theCommittee dated 06.09.20121. The ambient air quality data should bem<strong>on</strong>itored and results to be submitted.2. Wastewater treatment system for coalwashery to be submitted. The quantity<str<strong>on</strong>g>of</str<strong>on</strong>g> rejects from coal washery used forlandfilling to be specified.3. Detailed calculati<strong>on</strong>s and schematics forrainwater harvesting to be submitted.4. The total number <str<strong>on</strong>g>of</str<strong>on</strong>g> trees for existingand as well as proposed project to bementi<strong>on</strong>ed.5. Revised CSR programme to besubmitted as discussed in the <str<strong>on</strong>g>meeting</str<strong>on</strong>g>.Resp<strong>on</strong>se <str<strong>on</strong>g>of</str<strong>on</strong>g> the Prop<strong>on</strong>ent submitted <strong>on</strong>19.11.20121. The prop<strong>on</strong>ent has submitted ambient air qualityreport <str<strong>on</strong>g>of</str<strong>on</strong>g> the locality as well as within factorypremises. Ambient air quality report <str<strong>on</strong>g>of</str<strong>on</strong>g> thelocality are within permissible limit, howeverPM 10 & PM 2.5 results inside plant area aremarginally higher than prescribed limit.2. The prop<strong>on</strong>ent has withdrawn the proposal forinstallati<strong>on</strong> <str<strong>on</strong>g>of</str<strong>on</strong>g> 0.9 MTPA coal washery.3. The unit has proposed to store 916.24 KLrainwater in 01 no. rain water storage tank <str<strong>on</strong>g>of</str<strong>on</strong>g>capacity­ 15x15x4 m 3 .4. No. <str<strong>on</strong>g>of</str<strong>on</strong>g> existing trees­ 1797 & no. <str<strong>on</strong>g>of</str<strong>on</strong>g> proposedtrees­ 1603 in 33% <str<strong>on</strong>g>of</str<strong>on</strong>g> total land area i,e 8.25acres5. Item wise break up <str<strong>on</strong>g>of</str<strong>on</strong>g> CSR activities with totalbudgetary expenditure <str<strong>on</strong>g>of</str<strong>on</strong>g> Rs 1.4 cr. (2% <str<strong>on</strong>g>of</str<strong>on</strong>g> totalproject cost) has been submitted.The case was put up for c<strong>on</strong>siderati<strong>on</strong> in the 73 rd <str<strong>on</strong>g>SEAC</str<strong>on</strong>g> <str<strong>on</strong>g>meeting</str<strong>on</strong>g> held <strong>on</strong> <strong>30.11.2012</strong>. The <str<strong>on</strong>g>SEAC</str<strong>on</strong>g>c<strong>on</strong>sidered the submissi<strong>on</strong> by the prop<strong>on</strong>ent and recommended Envir<strong>on</strong>mental Clearance.Page 5 <str<strong>on</strong>g>of</str<strong>on</strong>g> 50

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!