WaterComprehensivePlan
- Page 6 and 7:
ASSET MANAGEMENTR&R needs areregula
- Page 8 and 9:
CONTENTSExecutive SummaryPageiiiCha
- Page 10 and 11:
Chapter 12 - Financial Information
- Page 12 and 13:
10-1 Federal Drinking Water Quality
- Page 14 and 15:
CHAPTER 1IntroductionUtilities Depa
- Page 16 and 17:
Demand. The quantity of water obtai
- Page 18 and 19:
EKCEast King CountyEKC-CWSP East Ki
- Page 20 and 21:
CHAPTER 2Water Utility PoliciesThe
- Page 22 and 23:
owner agrees to reimburse the City
- Page 24 and 25:
Facility AbandonmentWhen the Utilit
- Page 26 and 27:
Discussion:The Utility should syste
- Page 28 and 29:
Discussion:It is Bellevue’s polic
- Page 30 and 31:
Discussion:In 1982, Bellevue, along
- Page 32 and 33:
Waterworks UtilityFinancial Policie
- Page 34:
B. Self-sufficient FundingEach Util
- Page 40 and 41:
B. Funding LevelsFunding for capita
- Page 44 and 45:
D. Capital Facilities Renewal & Rep
- Page 46 and 47:
overhead for developer extension pr
- Page 48 and 49:
equired to balance the expenses. A
- Page 50 and 51:
demonstrate that the hydrologic res
- Page 52:
adopted to recover those costs dire
- Page 55 and 56:
In 2004, the Financial Consulting S
- Page 57 and 58:
Discussion:Providing reserves for e
- Page 59 and 60:
individual Transportation Analysis
- Page 61 and 62:
Table 3-2Residential Population Pro
- Page 63 and 64:
2006CURRENT LAND USENE 8TH ST104TH
- Page 65 and 66:
SERVICE AREAThe current Bellevue ci
- Page 67 and 68:
Table 3-3Interties(Regional Supply
- Page 69 and 70: Bellevue and Kirkland are currently
- Page 71 and 72: Water District No. 22Water District
- Page 73 and 74: Utility Service Review ProceduresTh
- Page 75 and 76: CHAPTER 4Water RequirementsThe exis
- Page 77 and 78: This type of demand is relatively c
- Page 79 and 80: • Apparent Losses: Includes unaut
- Page 81 and 82: Existing DemandExisting water deman
- Page 83 and 84: The future build-out demand project
- Page 85 and 86: Table 4-4cBuildout Demand Projectio
- Page 88 and 89: Table 4-6Comparison of Eastside Com
- Page 90 and 91: pressure throughout the rest of the
- Page 92 and 93: Pressure ZonesPressure zones are de
- Page 94 and 95: CHAPTER 5Water ConservationThe City
- Page 96 and 97: identifies the main categories of a
- Page 98 and 99: Table 5-2Historical Conservation Me
- Page 100 and 101: Speakers BureauThis measure is defi
- Page 102 and 103: Bill Showing Consumption HistoryThi
- Page 104 and 105: schedules, and efficient irrigation
- Page 106 and 107: Seasonal Demand ManagementThis meas
- Page 108 and 109: RowTable 5-5Conservation Savings Ac
- Page 110 and 111: Figure 5-1Single Family Water Use P
- Page 112 and 113: Since the post-conservation era beg
- Page 114 and 115: statement about each measure is inc
- Page 116 and 117: CHAPTER 6Existing SystemThis chapte
- Page 118 and 119: KIRKLANDREDMONDLakeWashingtonWest B
- Page 124 and 125: may also incorporate pump stations.
- Page 126 and 127: CCUD Supply ConnectionsThe Coal Cre
- Page 128 and 129: Table 6-5Pump StationsPage 1 of 2Na
- Page 130 and 131: Table 6-6Storage FacilitiesPage 1 o
- Page 132 and 133: Zone ValvesZone valves throughout t
- Page 134 and 135: ZonePrimary SupplyConnections Reser
- Page 136 and 137: CHAPTER 7Asset ManagementWhile incl
- Page 138 and 139: needed to manage those assets at a
- Page 140 and 141: 9876543210Figure 7-1Planned Water S
- Page 142 and 143: Table 7-1Criteria for Prioritizing
- Page 144 and 145: associated equipment which are dete
- Page 146 and 147: part of the 1998 Water Comprehensiv
- Page 148 and 149: SYSTEM SERVICE PRESSURE ANALYSISSys
- Page 150 and 151: As discussed in Chapter 4, storage
- Page 152 and 153: CriteriaBellevue receives most of i
- Page 154 and 155: Table 8-1aSummary of Storage Evalua
- Page 156 and 157: Table 8-1cSummary of Storage Evalua
- Page 158 and 159: from the point of supply to the poi
- Page 160 and 161: • If improvements to increase the
- Page 165 and 166: Group 4, serving greater than a 50,
- Page 167 and 168: Table 9-2Operations and Maintenance
- Page 169 and 170: Table 9-3Water Department Vehicles
- Page 171 and 172:
PREVENTIVE MAINTENANCEPreventive ma
- Page 173 and 174:
y this report were implemented. An
- Page 175 and 176:
next 20 years. Clearly defined role
- Page 177 and 178:
equired by state or federal regulat
- Page 179 and 180:
surface waters, establishing requir
- Page 181 and 182:
Table 10-32003-2004 Lead and Copper
- Page 183 and 184:
Am Test Laboratories14603 NE 87 th
- Page 185 and 186:
Table 10-4Timeline for Bellevue’s
- Page 187 and 188:
Table 10-6Proposed areas of LCR Rev
- Page 189 and 190:
SUMMARY OF REGULATORY STATUSReview
- Page 191 and 192:
similar in some respects to water f
- Page 193 and 194:
All properties using unapproved aux
- Page 195 and 196:
CHAPTER 11Recommended System Improv
- Page 197 and 198:
Modify and Rehabilitate the Bel-Red
- Page 199 and 200:
The City has proposed a budget of a
- Page 201 and 202:
Table 11-2Recommended Annual Capita
- Page 203 and 204:
TABLE 12-1City of BellevueWater Uti
- Page 205 and 206:
3. Wholesale water costs for 2006 t
- Page 207 and 208:
TABLE 12-3City of BellevueWater Uti
- Page 209 and 210:
TABLE 12-4City of BellevueWaterwork
- Page 211:
APPENDIX AState Environmental Polic
- Page 398:
APPENDIX CWater Utility Ordinances
- Page 487 and 488:
February 6, 2007To:Mr. Randall Thom
- Page 489 and 490:
CopyCenterFrom:Sheldon Lynne [Sheld
- Page 491 and 492:
CopyCenterFrom:Tom Peadon [tpeadon@
- Page 493 and 494:
UTRC water system plan review quest
- Page 495 and 496:
Plans for WUE DOH rule compliance:
- Page 497 and 498:
Emergency Response: coordination wi
- Page 499 and 500:
F-251: on-site systems in rural and