12.07.2015 Views

2006 Water Comprehensive Plan - City of Bellevue

2006 Water Comprehensive Plan - City of Bellevue

2006 Water Comprehensive Plan - City of Bellevue

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 9-1Engineering and Environment DivisionsStaff Certified by the Department <strong>of</strong> HealthEngineering ManagementNamePositionCertificateClassificationCertificate NumberWes Jorgenson, P.E. Assistant Director for Engineering WDM-4, CCS-1 3181Regan Sidie, P.E. Design Manager WDM-3 3860Joy Ramshur Development Review Manager WDS-2 6399Pam Maloney, P.E. Systems & Programs <strong>Plan</strong>ning Manager WDM-3 6106Other Certified Engineering StaffRob Hutchinson Development Review Pr<strong>of</strong>essional WDM-1, WDS-2, CCS-1, BAT 3830Rick Pederson Construction Inspector WDM-2, WDS-2, CCS-1 3664Chris Brookes Construction Inspector WDS-2 6825Brad Ayers Development Review Pr<strong>of</strong>essional WDS-2 4664Aaron Thress Construction Inspector WDM-2, WDS-2, CCS-1 5235Note: WDM = <strong>Water</strong> Distribution ManagerWDS = <strong>Water</strong> Distribution SpecialistCCS = Cross-connection Control SpecialistBAT = Backflow Assembly Tester9-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!