12.07.2015 Views

2006 Water Comprehensive Plan - City of Bellevue

2006 Water Comprehensive Plan - City of Bellevue

2006 Water Comprehensive Plan - City of Bellevue

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Bonds issued by the "<strong>Water</strong>works Utility," although primarily related to storm and surface watercapital financing needs in recent years, have earned very positive evaluation <strong>of</strong> credit worthinessby bond rating agencies, based on factors that include the financial position, reserve levels, andratio <strong>of</strong> net annual operating revenues to annual debt service payments (that is, debt servicecoverage) for the three utilities as a whole.The “<strong>Water</strong>works Utility” currently has a bond rating <strong>of</strong> “Aa2" from Moody's Investors Service.Ratings at this level indicate a strong degree <strong>of</strong> confidence by the rating agencies in the ability <strong>of</strong>the <strong>City</strong>'s utilities to repay related debt obligations. The <strong>Water</strong> Utility has no immediate plans toissue additional debt. However, if this action becomes necessary, the Utility can expect aproposed bond issue to receive a similarly favorable credit rating and, therefore, to sell at lowerinterest rates than would otherwise be possible.A comparative balance sheet and operating statement for the <strong>Water</strong>works Utility for the 8-yearperiod from 1998 through 2005 are provided in Tables 12-4 and 12-5 on the following pages.12-7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!