12.07.2015 Views

2006 Water Comprehensive Plan - City of Bellevue

2006 Water Comprehensive Plan - City of Bellevue

2006 Water Comprehensive Plan - City of Bellevue

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

PRIORITIZATION OF IMPROVEMENTSCapital Improvement projects to address future capacity needs are listed in Table 11-1.Recommended CIP projects/programs from <strong>2006</strong> to 2013 are presented in Table 11-2 and arelisted with average anticipated annual funding over the next 7 years. The funding prioritiesshown can be expected to change and should not be construed as a commitment by the <strong>City</strong> t<strong>of</strong>und a particular program at the level shown. The <strong>City</strong> updates and adopts the 7-year CIP, withdetailed funding sources and scheduling, every 2 years concurrent with the Operating Budget.This 7-year plan should be referenced to determine actual project commitment schedules.During each update, all proposed CIP projects are weighed against specific criteria and areprioritized, funded, and scheduled accordingly.Table 11-1Capital Improvement Projects to Address Future Capacity NeedsProject DescriptionYearNeededProject Cost(<strong>2006</strong> dollars)**Bel- Red Road Inlet ModificationsIncrease West Operating Area Reservoir StorageCapacity*Increase System Capacity to Move <strong>Water</strong> from the EastOperating Area to the West Operating Area *Increase West Operating Area Supply Inlet Capacity2009 350,0002017 5,200,0002017 3,600,0002017 Unknown*One or both <strong>of</strong> these project, or some combination <strong>of</strong> the projects with reduced scopes is required**Project costs are planning level estimates11-6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!