02.12.2012 Views

Download LINK - Rieter

Download LINK - Rieter

Download LINK - Rieter

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

16 <strong>LINK</strong> 55 . 2 /2010<br />

PRODUCT NEWS<br />

The new upgrade package<br />

for R 20 robots<br />

There is no room for compromises when it comes to yarn quality.<br />

The upgrade package for the R 20 robot maintains efficiency at a<br />

high level.<br />

Fig. 1 A total overhaul<br />

of the R 20 robot enhances<br />

efficiency and<br />

yarn quality.<br />

In economically difficult times it is especially important<br />

that the machines installed in the mill operate<br />

to a high technical standard. Production efficiency is<br />

ensured by regular servicing and the systematic replacement<br />

of wearing parts. This also prolongs the<br />

service life of the machines.<br />

Robots on older rotor spinning machines can be given<br />

a total overhaul in the Ingolstadt plant. Numerous<br />

robots from RU 14 / RU 14A and R1 rotor<br />

spinning machines have already been upgraded. The<br />

upgrade package for the R 20 robot has been available<br />

since the end of 2009.<br />

The R 20 robot is in operation daily, year after year.<br />

The severe stress this entails inevitably has an impact<br />

on the robot’s mechanical functions. An upgrade<br />

package for the R 20 robot offers more than<br />

just servicing and fine mechanical adjustment.<br />

The scope of the upgrade comprises numerous improvements<br />

that have been incorporated in the R 40<br />

series. These also include new developments. Following<br />

the upgrade of the R 20 robot, customers<br />

have a 6-month warranty on the entire robot.<br />

Modular upgrade – depending on the customer’s<br />

requirements<br />

The upgrade package for the R 20 robot is modular<br />

in structure. <strong>Rieter</strong> recommends installation of the<br />

complete upgrade package to enable all new functions<br />

to be utilized. Price-conscious customers can<br />

order only parts of the overall package. The upgrade<br />

package for the R 20 robot includes 9 new components.<br />

• <strong>Rieter</strong> LGPS laser-guided -guided positioning system<br />

The LGPS positions the robot accurately in relation<br />

to the spinning box by means of a laser beam and<br />

a reflector. Precise, smooth positioning of the robot<br />

makes the centering bars superfluous and the<br />

clutch of the travel motor is eliminated. This reduces<br />

downtimes and increases productivity.<br />

• EVO multivalve<br />

This precisely actuated vacuum system increases<br />

the operating reliability of the robot. Trailing<br />

threads at the air duct are eliminated.<br />

• M305 EVO piecing cylinder motor<br />

This high-quality motor has a long service life and<br />

features wear-free, digital speed monitoring which<br />

ensures constant rotation speed during piecing –<br />

a precondition for accurate piecing.<br />

• EVO hood opening unit<br />

The new hood opening unit improves the stability<br />

of the sequence of motion of the mechanical components<br />

and considerably prolongs service life. The<br />

compressed air supply for rotor cleaning is also improved<br />

by the pulsating delivery of compressed<br />

air and the new components. The new “Xclean”<br />

program actuates repeated cleaning of the rotor<br />

groove during acceleration, thus increasing piecing<br />

reliability and spinning quality.<br />

• Tailing unit<br />

A new, integrated clamping device reduces laps<br />

around the winder arms. Maintenance effort by operating<br />

personnel is reduced and package quality<br />

is improved.<br />

• IV thread accumulator<br />

A new sensor measures thread tension and thus<br />

defines the precise package mounting time during<br />

piecing and enhances robot efficiency.<br />

• Supply tube system<br />

The robot always carries an empty tube. This eliminates<br />

the time-consuming wait for an empty tube to<br />

be delivered prior to the change process. Package<br />

change is 20% faster.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!