13.07.2015 Views

STP 10-92A34-SM-TG Soldier's Manual and Trainer's ... - AskTOP

STP 10-92A34-SM-TG Soldier's Manual and Trainer's ... - AskTOP

STP 10-92A34-SM-TG Soldier's Manual and Trainer's ... - AskTOP

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>STP</strong> <strong>10</strong>-<strong>92A34</strong>-<strong>SM</strong>-<strong>TG</strong>Performance Stepsc. Manage shipping operations.(1) Monitor the AMS processing procedures.(2) Monitor Radio Frequency (RF-Tag) processing procedures.d. Employ safety <strong>and</strong> risk management measures.3. Manage turn-ins <strong>and</strong> reparable management. (References: AR 7<strong>10</strong>-2, Chapter 3, paragraph 3-14<strong>and</strong> DA Pamphlet 7<strong>10</strong>-2-2, Chapter 11)a. Review major assembly processing procedures.b. Manage the requirement of all unserviceable equipment to have a DD Form 1577-2(Unserviceable (Repairable) Tag - Materiel).c. Review the Operations <strong>and</strong> Maintenance-Army national item identification number (OMA NIIN)file to ensure it matches the units repair capability.d. Coordinate with Support Operations (SOP) for delivery/pickup of issued assets <strong>and</strong> turn-ins(to maintenance <strong>and</strong>/or for disposal).e. Process turn-ins to maintenance (for reparable items).f. Employ safety <strong>and</strong> risk management measures.4. Manage retrograde operations. (References: AR 7<strong>10</strong>-2; AR 725-50, Chapter 6, paragraph 6-14 <strong>and</strong>Chapter 7; DA Pamphlet 7<strong>10</strong>-2-1; <strong>and</strong> DA Pamphlet 7<strong>10</strong>-2-2)a. Identify theater retrograde procedures.b. Identify theater sustainment stocks.NOTE: Retrograde operations could include North Atlantic Treaty Organization (NATO) <strong>and</strong> other hostnation equipment. Follow local disposition instruction for equipment other than the United States (U.S.).c. Ensure theater retrograde procedures are complied with.d. Facilitate the theater retrograde mission based on dispositions <strong>and</strong> instructions.e. Coordinate with the appropriate maintenance activity for classification (if required).5. Manage storage support functions. (References: FM <strong>10</strong>-15, Chapter 8 <strong>and</strong> TM 38-400, Chapter 3,paragraph 3-39)a. Perform storage <strong>and</strong> inventory management functions as directed by stock control.b. Maintain a current Authorized Stockage List (ASL) for all supported commodities.c. Monitor stock locations <strong>and</strong> storage procedures.d. Manage the five-digit stock location system.e. Enforce one stock numbered item with one condition code be placed in as single location.f. Enforce the Care of Supplies in Storage (COSIS).g. Establish procedures for processing materiel release denials.h. Determine Materiel H<strong>and</strong>ling Equipment (MHE) requirements to support operations.i. Employ safety <strong>and</strong> risk management measures.6. Manage security requirements. (References: AR 25-2, Chapters 1 <strong>and</strong> 4, paragraphs 1-4 through4-1; <strong>and</strong> AR 190-51, Chapter 3, paragraph 3-11)a. Manage SARSS1 System Information Security.(1) Monitor the Army Information Assurance Program (AIAP).(2) Establish checks <strong>and</strong> balances to reduce the risk of one individual adversely affectingsystem or network operations.(3) Implement physical security requirements for Information Security to prevent loss,damage, or unauthorized access.(4) Oversee password generation, issuance, <strong>and</strong> control process.b. Manage physical security requirements.(1) Manage the physical protective requirement for classified repair parts.(2) Manage physical protective measures.(a) Implement physical protective measures for risk level I.(b) Implement physical protective measures for risk level II.(c) Implement physical protective measures for risk level III.(3) Employ safety <strong>and</strong> risk management measures.3-2 7 May 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!