13.07.2015 Views

STP 10-92A34-SM-TG Soldier's Manual and Trainer's ... - AskTOP

STP 10-92A34-SM-TG Soldier's Manual and Trainer's ... - AskTOP

STP 10-92A34-SM-TG Soldier's Manual and Trainer's ... - AskTOP

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>STP</strong> <strong>10</strong>-<strong>92A34</strong>-<strong>SM</strong>-<strong>TG</strong>Subject Area 3: Supervisory SARSS1 OperationsAnalyze Performance Metrics<strong>10</strong>1-92A-3216Conditions: Assigned as a Senior Automated Logistics Specialist in Supply Support Activity (SSA),Materiel Management Center (MMC) performing SARSS operations. You are given the requirement toAnalyze Performance Metrics. Given various Army regulations, pamphlets, technical manuals, supplypublications, (AR 7<strong>10</strong>-2; TM 38-400; <strong>and</strong> FM <strong>10</strong>-15) internal <strong>and</strong> external st<strong>and</strong>ard operating procedures(SOPs), a desktop computer serving as a file server with the St<strong>and</strong>ard Army Retail Supply System(SARSS), Material Release Order Control System (MROCS), Radio Frequency (Automatic) Identification,Automated Manifest System (AMS) equipment <strong>and</strong> software installed <strong>and</strong> configured.St<strong>and</strong>ards: Analyzed Performance Metrics in accordance with local SOPs <strong>and</strong> AD<strong>SM</strong> 18-L1Q-AJP-ZZZ-EM <strong>and</strong> AR 7<strong>10</strong>-2 guidelines.Performance Steps1. Identify DA Performance St<strong>and</strong>ard that compares actual performance with establishedDA st<strong>and</strong>ards. (Reference: AR 7<strong>10</strong>-2, Chapter 1, paragraph 1-22)a. Zero Balance with Dues-Out.b. Denial Rate.c. Dem<strong>and</strong> Satisfaction.d. Excess.2. Identify Supply System Performance that reflects the performance of the supply system.(Reference: AD<strong>SM</strong> 18-L1Q-AJP-ZZZ-EM, Section 15.3)a. Daily Performance Statistics.b. Performance Reports.(1) Performance Report I.(2) Performance Report II.(3) Performance Report III.3. Identify contributing factors for high Zero Balance with Dues-Out. (Reference: AR 7<strong>10</strong>-2, Chapter 1,paragraph 1-22)a. Inventory Adjustment.b. Pilferage.c. RO <strong>and</strong> ROP.4. Identify contributing factors for high Materiel Denial rate. (Reference: AR 7<strong>10</strong>-2, Chapter 1,paragraph 1-22)a. Location changes.b. Overage Material Release Order (MRO).c. Unreported Shortages.d. Pilferage.5. Identify contributing factors for poor Dem<strong>and</strong> Satisfaction. (Reference: AR 7<strong>10</strong>-2, Chapter 1,paragraph 1-22)a. ROs <strong>and</strong> ROPs.b. ASL items OST.c. The velocity in which the supply systems provides products to its customers.d. Dollar Cost B<strong>and</strong>ing/ASL Review Board.Evaluation Preparation: At the test site, provide all materials that are relevant to the task to includethose mentioned in the Conditions statement.3-12 7 May 2008

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!