13.07.2015 Views

Stratos HSSD-2 • INSTALLER'S HANDBOOK

Stratos HSSD-2 • INSTALLER'S HANDBOOK

Stratos HSSD-2 • INSTALLER'S HANDBOOK

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

5.3.3 Connectingpower cablesFor the system to meet full EMC compliance requirements, the following precautionsshould be taken:■Screened power cable should be used.■The earth wire of power cables should be connected to the detector EARTHterminal, and this in turn connected to an earth stud on the detector chassis.■All cables (power and signal) should pass through the screw-in metal cable glandsprovided. The screen of the power cable should be terminated at the cable gland.■Power cables need to be fitted with a ferrite ring inside the detector case (2 offprovided). The 24V and 0V wires should be long enough to form a loop aroundthe ferrite wall.■Separate wires from the power cables should be kept as short as possible, justenough to provide adequate stress relief.Diagrams below show the appropriate arrangements for top and rear entry cables.Cable screenCable glandCable glandEarthstudFerriteEarthstudFerriteTop cable entry optionRear cable entry optionPage 31<strong>Stratos</strong> <strong>HSSD</strong>-2 • INSTALLER’S <strong>HANDBOOK</strong> • Iss. 10© AirSense Technology. 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!