Water Supply Plan - City of Miami
Water Supply Plan - City of Miami
Water Supply Plan - City of Miami
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
EXHIBIT 2-4<br />
Summary <strong>of</strong> Construction and Capacities in the Alexander Orr Subarea Wellfields<br />
Wellfield Operational <strong>Plan</strong>, South Florida <strong>Water</strong> Management District<br />
Well Number<br />
Status if Not<br />
Active<br />
Date<br />
Constructed<br />
Diameter<br />
(Inches)<br />
Total<br />
Depth<br />
(feet)<br />
Casing<br />
Depth<br />
(feet)<br />
Pump<br />
Type 1<br />
SECTION 2: MIAMI-DADE WATER AND SEWER DEPARTMENT WELLFIELDS<br />
Capacity 1<br />
(gpm)<br />
Wellfield<br />
Capacity<br />
(gpm) 1<br />
Wells -<br />
Designed<br />
Installed<br />
Capacity<br />
(MGD) 1<br />
Wellfield<br />
Designed<br />
Installed<br />
Capacity<br />
(MGD) 1<br />
20 1959 24 100 35 T 7500 10.80<br />
25 1982 24 104 54 T 7500 10.80<br />
26 1982 24 104 54 T 7500 10.80<br />
27 1982 24 104 54 T 7500 10.80<br />
28 1982 24 104 54 T 7500 10.80<br />
38 (32) 1997 48 88 33 T 7500 10.80<br />
39 (33) 1997 48 88 33 T 7500 10.80<br />
40 (34)<br />
West Wellfield<br />
1997 48 88 33 T 7500 10.80<br />
29 1994 24 70 35 T 7500 22,500 10.80 32.40<br />
30 1994 24 70 35 T 7500 10.80<br />
31 Stand-by 1994 24 70 35 T 7500 10.80<br />
Total Capacities -<br />
Biscayne Aquifer 213,850 213,850 307.96 307.96<br />
Floridan Aquifer ASR Wells<br />
West Wellfield<br />
33 - ASR 1 (35)<br />
Used for<br />
blending, not for<br />
injection.<br />
Used for<br />
blending, not for<br />
1996 30 1300 850 3500 5.04 15.12<br />
34 - ASR 2 (36)<br />
injection.<br />
Used for<br />
blending, not for<br />
1997 30 1250 845 3500 5.04<br />
35 - ASR 3 (37)<br />
injection. 1997 30 1210 835 3500 5.04<br />
WB062007003DFB_355608.GM.WW_06/07.DOC 2-16