04.12.2012 Views

Water Supply Plan - City of Miami

Water Supply Plan - City of Miami

Water Supply Plan - City of Miami

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> <strong>Miami</strong><br />

<strong>Water</strong> <strong>Supply</strong> Facilities Work <strong>Plan</strong>s<br />

___________________________________________________________________<br />

Aquifer, protect the quality <strong>of</strong> surface water and related ecosystems, consider and are<br />

compatible with the South Florida <strong>Water</strong> Management District’s Lower East Coast<br />

Regional <strong>Water</strong> <strong>Supply</strong> <strong>Plan</strong>, and comply with that land use and environmental protection<br />

policies <strong>of</strong> the <strong>City</strong> MCNP, the Strategic Regional Policy <strong>Plan</strong> for South Florida, and the<br />

State Comprehensive <strong>Plan</strong>.<br />

Objective PW-1.3: The <strong>City</strong> shall coordinate with the <strong>Miami</strong>-Dade County <strong>Water</strong> <strong>Supply</strong><br />

Facilities Work <strong>Plan</strong> to identify and develop those water supply projects necessary to<br />

meet the <strong>City</strong>’s projected water demands for a 20-year period.<br />

Policy PW-1.3.1: The <strong>City</strong>’s adopted <strong>Water</strong> <strong>Supply</strong> Facilities Work <strong>Plan</strong> (Work <strong>Plan</strong>),<br />

dated October 2009, is incorporated as follows in Appendix PW-1 <strong>of</strong> the MCNP. This<br />

document is designed to: assess current and projected potable water demands; evaluate<br />

the sources and capacities <strong>of</strong> available water supplies; and, identify those water supply<br />

projects, using all available technologies, necessary to meet the <strong>City</strong>’s water demands for<br />

a 20-year period. The Work <strong>Plan</strong> shall remain consistent with projects as listed in the<br />

South Florida <strong>Water</strong> Management District’s Lower East Coast Regional <strong>Water</strong> <strong>Supply</strong><br />

<strong>Plan</strong>. The Work <strong>Plan</strong> will be updated, at a minimum, every 5-years and within 18 months<br />

after the South Florida <strong>Water</strong> Management District’s approval <strong>of</strong> an updated Lower East<br />

Coast Regional <strong>Water</strong> <strong>Supply</strong> <strong>Plan</strong>. The potable water supply facilities necessary to<br />

satisfy projected water demands for the <strong>City</strong> <strong>of</strong> <strong>Miami</strong> during the 2007-2030 period are<br />

shown in Appendix A <strong>of</strong> the <strong>Water</strong> <strong>Supply</strong> Facilities Work <strong>Plan</strong> (Appendix PW-1).<br />

Policy PW-1.3.2: The <strong>City</strong> shall be consistent with the current approved version <strong>of</strong> South<br />

Florida <strong>Water</strong> Management District’s Lower East Coast Regional <strong>Water</strong> <strong>Supply</strong> <strong>Plan</strong> and<br />

the current adopted County’s <strong>Water</strong> <strong>Supply</strong> Facilities Work <strong>Plan</strong> in developing and<br />

updating its 20-Year Work <strong>Plan</strong>.<br />

* * *<br />

_________________________________________________________________________<br />

April, 2010<br />

15

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!