04.12.2012 Views

Water Supply Plan - City of Miami

Water Supply Plan - City of Miami

Water Supply Plan - City of Miami

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EXHIBIT 2-6<br />

Summary <strong>of</strong> Construction and Capacity in the South Dade Subarea Wellfields<br />

Wellfield Operational <strong>Plan</strong>, South Florida <strong>Water</strong> Management District<br />

Well Number<br />

Status if<br />

Not Active<br />

Date<br />

Constructed<br />

Diameter<br />

(Inches)<br />

Total<br />

Depth<br />

(feet)<br />

Casing<br />

Depth<br />

(feet)<br />

Pump<br />

Type 1<br />

SECTION 2: MIAMI-DADE WATER AND SEWER DEPARTMENT WELLFIELDS<br />

Capacity 1<br />

(gpm)<br />

Wellfield<br />

Capacity<br />

(gpm) 1<br />

Wells -<br />

Designed<br />

Installed<br />

Capacity<br />

(MGD) 1<br />

Wellfield<br />

Designed<br />

Installed<br />

Capacity<br />

(MGD) 1<br />

1 Proposed N/A N/A N/A T 1050 2,100 1.50 3.00<br />

2 Proposed N/A N/A N/A T 1050 1.50<br />

Former <strong>Plan</strong>t Wellfield<br />

1<br />

Roberta Hunter Park Wellfield<br />

Proposed N/A N/A N/A T 2100 2,100 3.00 3.00<br />

1 Proposed N/A N/A N/A T 1050 7,350 1.50 10.50<br />

2 Proposed N/A N/A N/A T 1050 1.50<br />

3 Proposed N/A N/A N/A T 1050 1.50<br />

4 Proposed N/A N/A N/A T 1050 1.50<br />

5 Proposed N/A N/A N/A T 1050 1.50<br />

6 Proposed N/A N/A N/A T 1050 1.50<br />

7<br />

Rock Pit Park Wellfield<br />

Proposed N/A N/A N/A T 1050 1.50<br />

1 Future N/A N/A N/A N/A N/A N/A N/A N/A<br />

2 Future N/A N/A N/A N/A N/A N/A N/A N/A<br />

N otes:<br />

1. gpm = gallons per minute; MGD = million gallons per day; C = Centrifugal; T = Turbine; N/A = Not Available<br />

2. Initial source for capacity information was extracted from the 2002 <strong>Water</strong> Facilities Master <strong>Plan</strong>. After site visits from MSA and<br />

documents provided by MDWASD well operator, conflicting information was provided to senior MDWASD staff for verification. When<br />

required, changes were made accordingly.<br />

3. Information other than capacity information is based on data included in the South Dade <strong>Water</strong> Use Permit provided by MDWASD staff.<br />

4. Proposed wells, already designed and permitted (except for Rock Pit Park wells which are only at the conceptual design level).<br />

WB062007003DFB_355608.GM.WW_06/07.DOC 2-24

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!