<strong>Water</strong> Facilities Master <strong>Plan</strong><br />
Existing <strong>Water</strong> <strong>Supply</strong> Facilities<br />
A 3-14<br />
KM2740.Sec3.doc<br />
11/26/2007<br />
Table 3-3: WASD Facilities Capacities<br />
Facility Installed Capacity (mgd)<br />
Hialeah-Preston <strong>Water</strong> Treatment <strong>Plan</strong>ts<br />
Hialeah-Preston Well fields<br />
60 + 165 = 225<br />
Preston 53.28<br />
Hialeah 12.54<br />
<strong>Miami</strong> Springs 79.30<br />
Northwest (a) 149.35<br />
Subtotal 294.47<br />
Medley Wellfield (b) 43.20<br />
Alexander Orr <strong>Water</strong> Treatment <strong>Plan</strong>t<br />
Alexander Orr Well fields<br />
248<br />
Orr <strong>Plan</strong>t 74.40<br />
Snapper Creek 40.00<br />
Southwest 161.20<br />
West 32.40<br />
Subtotal 308.00<br />
South Dade <strong>Water</strong> Treatment <strong>Plan</strong>ts<br />
South Dade Wellfields<br />
10.61<br />
Elevated Tank 4.32<br />
Everglades Labor Camp 4.18<br />
Leisure <strong>City</strong> 6.12<br />
Naranja 1.15<br />
Newton 4.32<br />
South Dade Wellfield Subtotal 20.09<br />
South <strong>Miami</strong> Heights <strong>Water</strong> Treatment <strong>Plan</strong>t (c) South <strong>Miami</strong> Heights Wellfields<br />
20<br />
(c)<br />
Caribbean Park 3.00<br />
Former <strong>Plan</strong>t 3.00<br />
Roberta Hunter Park 10.50<br />
Rock Pit Park 3.00<br />
South Dade Wellfield Subtotal 19.50<br />
WASD Wellfield Total 642.06<br />
WASD <strong>Water</strong> Treatment <strong>Plan</strong>t (d) Total<br />
(a) Northwest wellfield capacity at 150 mgd when pumps operate at low speed.<br />
495.90<br />
(b) Wells in this wellfield had been abandoned. They were recently restored with the purpose <strong>of</strong> using<br />
them only during an emergency.<br />
(c) Proposed Facilities once these facilities come on line, South Dade’s Elevated Tank, Leisure <strong>City</strong> and<br />
Naranja dropout.<br />
(d) Not including Elevated Tank, Leisure <strong>City</strong> and Naranja, but including South <strong>Miami</strong> Heights.<br />
Source: MDWASD Draft Wellfield Operational <strong>Plan</strong>, 2007